General Inspection | 9/15/2011 | 9/15/2011 | 9/15/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 9/15/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/15/2011 | 8/15/2011 | 8/16/2011 | | PART |
Dave Hannah
|
|
|
|
General Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/13/2011 | 6/13/2011 | 6/13/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/10/2011 | 5/13/2011 | 5/13/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/10/2011 | 5/10/2011 | 5/10/2011 | A | PART |
Clint A Smith
|
|
|
Stop work order lifted. Verbal to RP: Sweep up the gutterpan of all sediment and debris. Remove the sand bag within the gutterpan. Maintain the storm drain inlet protection. Also provide a washout for all non storm water pollunants. Will follow up on 5/13/2011AM
|
Site Preparation | 5/9/2011 | 5/11/2011 | 5/10/2011 | A | CANC |
Clint A Smith
|
|
|
Moved to 5/10/2011
|
Stop Work Order | 5/9/2011 | 5/9/2011 | 5/10/2011 | P | DONE |
Clint A Smith
|
|
|
|
General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 | | CANC |
Clint A Smith
|
|
|
Moved to a Complaint Inspection. STOP WORK ORDER is in place.
|
Complaint Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 | P | FAIL |
Clint A Smith
|
|
|
STOP WORK ORDER. 1.Clean up all sediment off of all hard sufaces. 2. Sweep up street with a street sweeper, not washed with water. 3. Install sediment barriers along the front perimeter of project. 4. Maintain the storm drain inlet protection. 5. Provide a "Valid" RP that has day to day control over operations in regards with erosion and sediment control. Will release the Stop Work Order once all issues have been corrected.
|
General Inspection | 4/7/2011 | 4/7/2011 | 4/7/2011 | | CANC |
Clint A Smith
|
|
|
Completed by 425
|
General Inspection | 3/7/2011 | 3/7/2011 | 3/7/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/4/2011 | 1/4/2011 | 1/4/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/16/2010 | 9/16/2010 | 9/16/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Prior to a storm event, cover the stock pile with visquen or remove sockpile located in the drive way.
|