Permit Information
Permit NumberESC10-00904
StatusFinaled
Name TONY LUCHINI
Site Address 4268 S SAWDUST PL
Project Name 
Customer Number 
ePlanReviewNo
Description
Per the attached ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/3/20116/3/20116/8/2011PPASS
DetailsDave Hannah
DOC - Permit Finaled6/8/20116/8/20116/8/2011PPASS
DetailsDave Hannah
Tracking Control5/23/20115/24/20115/24/2011PPASS
DetailsClint A Smith
Tracking Control5/23/20115/23/20115/23/2011AFAIL
DetailsClint A Smith
Correction Notice: (message to RP who responded via text message)
1. Clean up all tracked sediment and debris off of all hard surfaces in the culdisac out to Sawmill Way.
2. Clean all sediment and debris off of all hard surfaces within the whole project area.
Failure to comply with the given notice, will result in a Stop Work Order. Will re-inspect on 5/24/2011PM.
General Inspection5/19/20115/19/20115/19/2011PPART
DetailsSteven Webb
Conference as well as general inspection. Met with RP and contractors stucco contractor, provided an overview of what is expected to comply in regards to containment of stucco/concrete residual. As well, the need to provide sweeeping on sawdust and sawmill area. Inspector 460 will follow up.
BMP Violation4/12/20114/14/20114/14/2011PPART
DetailsClint A Smith
Discussed with the RP over the issue of providing a washout for all the sub contractors on the project lot so clean out can occur in a contained pit or exteral pit. He explained that the Stucco contractor will provide a wasout on all lots that stuco work will be occuring prior to any cleanout occuring. All other sub contractors either cleanout at the commen subdivion washout or back at the facility. Also explained to the RP if the violation occurs again on any of their project lots, it will requirement to provide a washout on all of the project lots.
Conference4/12/20114/12/20114/12/2011PFAIL
DetailsClint A Smith
The RP of the project notified the city of the issue that the Stucco sub contractor left by cleaning out his mixer and tools off on the project lot not within a contained washout pit. The RP explained that they are aware of the situation and will have in cleaned up by the first thing in the morning. Will follow up with a conversation to the RP on 4/14/2011PM and explain to him the requirement that all lots must have a washout for all non stormwater pollutants that are Non VOC.
Random Inspection2/15/20112/15/20112/16/2011PPASS
DetailsDave Hannah
Site Preparation2/14/20112/14/20112/14/2011PDONE
DetailsDave Hannah
General Inspection2/4/20112/4/20112/4/2011PPASS
DetailsBob Reichert
looked ok
Site Preparation1/10/20111/10/20111/10/2011 PASS
DetailsClint A Smith