DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/18/20113/18/20113/18/2011 DONE
DetailsClint A Smith
PErmit finalled.
DOC - Permit Finaled3/18/20113/18/20113/18/2011PPASS
DetailsClint A Smith
General Inspection3/3/20113/3/20113/3/2011 PASS
DetailsClint A Smith
General Inspection2/16/20112/16/20112/16/2011 PASS
DetailsClint A Smith
All work complete. Waiting on the spring to remove the hay bales at the discharge point of the pond.
Site Preparation1/19/20112/1/20112/1/2011APART
DetailsClint A Smith
BMP's inplace of the vault. Explained to RP to keep an eye on the clarity of the discharge while clearing out the tully's within the pond. the final discharge of the pond is an outfall off of Walnut street into the Boise River. All debris from the extraction will bee placed at the airport.
Site Preparation1/18/20111/28/20111/28/2011ANR
DetailsClint A Smith
Will begin on 2/1/2011. Inspection will be completed on that date.
Site Preparation1/17/20111/17/20111/18/2011 NR
DetailsClint A Smith