Site Final | 9/29/2011 | 9/29/2011 | 9/30/2011 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/30/2011 | 9/30/2011 | 9/30/2011 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 9/12/2011 | 9/12/2011 | 9/12/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 8/11/2011 | 8/11/2011 | 8/11/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/11/2011 | 7/11/2011 | 7/11/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP and Developer (Jeff Snyder): Clean up all stucco wash out and piles. Provide a washout pit through the duration of the project, until the time when no non storm water pollutants need to be washed out. Will re-inspect on 7/13/2011AM.
|
General Inspection | 6/10/2011 | 6/10/2011 | 6/10/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/10/2011 | 5/10/2011 | 5/10/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/8/2011 | 4/8/2011 | 4/8/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Imeadiately provide a concrete washout pit prior to the concrete trucks needing to clean out.
|
General Inspection | 3/8/2011 | 3/8/2011 | 3/8/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to Owner (Jeff Snyder) provide a washout pit prior next time of any concrete pours. Also clean up all washed out concrete in the area where washout pit should be placed. Also maintain construction exit.
|
General Inspection | 2/2/2011 | 2/2/2011 | 2/2/2011 | | PART |
Clint A Smith
|
|
|
Moved as a SITE PREPARATION.
Verbal to RP: Install siltfence per industry standards or remove and replace wwith a different type of sediment barrier. Stop Work Order has been lifted.
|