Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberESC11-00059
StatusFinaled
Name DAVE JENKINS
Site Address 11818 W JOPLIN RD
Project NameStruvite production Facility
Customer Number 
ePlanReviewNo
Description
Production Facility-West Boise Wastewater Facility
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/10/201212/10/201212/10/2012 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled12/10/201212/10/201212/10/2012PPASS
DetailsClint A Smith
General Inspection11/8/201211/8/201211/8/2012 PASS
DetailsClint A Smith
Most of the work is complete.
General Inspection10/8/201210/8/201210/9/2012 PASS
DetailsKimberly M. Johnson
General Inspection9/5/20129/7/20129/10/2012APASS
DetailsClint A Smith
Project is mostly complete. Will be be appling a hydrolic seed, tach, mulch mixture on the small postions of disturded soil within the completed construction area.
General Inspection9/3/20129/3/20129/3/2012 CANC
DetailsSteven Webb
Holiday
General Inspection7/2/20127/2/20127/30/2012 PASS
DetailsJim Sly
General Inspection4/30/20124/30/20124/30/2012 PASS
DetailsClint A Smith
General Inspection1/26/20121/26/20121/26/2012 PASS
DetailsClint A Smith
General Inspection12/26/201112/26/201112/27/2011ACANC
DetailsSteven Webb
Holiday
General Inspection11/25/201111/25/201111/25/2011 PASS
DetailsClint A Smith
General Inspection10/17/201110/17/201110/19/2011 PASS
DetailsJack Frank
ok talked with contr. about dirt on hard surfaces, they will clean at end of day
General Inspection9/15/20119/15/20119/16/2011 PASS
DetailsClint A Smith
General Inspection8/15/20118/15/20118/22/2011 CANC
DetailsJim Johnson
Random Inspection7/13/20117/13/20117/13/2011PPASS
DetailsTom Arcoraci
Site Preparation6/16/20116/16/20116/16/2011 PASS
DetailsClint A Smith
Site Preparation5/16/20115/17/20115/17/2011APASS
DetailsClint A Smith
No other activity outside of erosion control can occur until permit have been issued within the build dept.
Site Preparation5/13/20115/16/20115/16/2011APART
DetailsClint A Smith
Permit was issued today. Will have a Site Preparation inspection on 5/17/2011 10:00am.
Site Preparation5/14/20115/16/20115/14/2011ACANC
DetailsClint A Smith
Site Preparation5/13/20115/13/20115/14/2011PCANC
DetailsClint A Smith
Wrong date
General Inspection8/2/20128/2/2012   
DetailsJim Sly
General Inspection5/31/20125/31/2012   
DetailsJim Sly
General Inspection3/29/20123/29/2012   
DetailsClint A Smith
General Inspection2/27/20122/27/2012   
DetailsJim Sly