General Inspection | 6/30/2011 | 6/30/2011 | 6/30/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/15/2011 | 6/15/2011 | 6/15/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/27/2011 | 5/31/2011 | 5/31/2011 | A | PASS |
Clint A Smith
|
|
|
Have installed a plastic barrier where the water would discharge. The barrier will be removed once the sediment has settled out.
|
General Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | | PART |
Clint A Smith
|
|
|
Work is complete. Will re-inspect on 5/31/2011 to see if discharging is occuring.
|
Site Preparation | 5/12/2011 | 5/12/2011 | 5/12/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the project area where visable from the street.
|