General Inspection | 4/26/2012 | 4/26/2012 | 5/3/2012 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/3/2012 | 5/3/2012 | 5/3/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 4/26/2012 | 4/27/2012 | 4/30/2012 | P | DONE |
Clint A Smith
|
|
|
All work completed. Permit finaled.
|
Site Final | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/26/2012 | 3/26/2012 | 3/26/2012 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 2/23/2012 | 2/23/2012 | 2/24/2012 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 1/20/2012 | 1/23/2012 | 1/23/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/20/2012 | 1/20/2012 | 1/20/2012 | | CANC |
Clint A Smith
|
|
|
MOved to 1/23/2012
|
Conference | 12/20/2011 | 12/20/2011 | 12/20/2011 | A | DONE |
Clint A Smith
|
|
|
Went over the conditions of the permit with the RP and explained the federal permit disclosure.
|