General Inspection | 5/13/2013 | 5/13/2013 | 5/13/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 5/13/2013 | 5/13/2013 | 5/13/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/11/2013 | 4/11/2013 | 4/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/11/2013 | 3/11/2013 | 3/11/2013 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 2/4/2013 | 2/7/2013 | 2/7/2013 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/4/2013 | 2/4/2013 | 2/4/2013 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP (oliver w/ Steed Cont.) Provide a stabilized construction exit going out to Cloverdale. Will re-inspect on 2/7/2013
|
General Inspection | 1/3/2013 | 1/3/2013 | 1/4/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 11/2/2012 | 11/2/2012 | 11/2/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/28/2012 | 10/2/2012 | 10/2/2012 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/24/2012 | 9/27/2012 | 9/28/2012 | A | FAIL |
Clint A Smith
|
|
|
WIll re-inspect on 10/2/2012
|
General Inspection | 9/21/2012 | 9/21/2012 | 9/24/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP(Tyson): Maintain and replace washout area including the mortar mix area. Will re-inspect on 9/27/2012
|
General Inspection | 8/21/2012 | 8/21/2012 | 8/22/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/19/2012 | 7/19/2012 | 7/19/2012 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 6/14/2012 | 6/18/2012 | 6/19/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/13/2012 | 6/14/2012 | 6/14/2012 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Relocate ESC sign where visable from the street. Add access control measures to direct all traffic through the stabilized construction exit. Will follow up on 6/18/2012.
|
Site Preparation | 6/11/2012 | 6/12/2012 | 6/12/2012 | A | FAIL |
Jim Sly
|
|
|
Odie phone ###-#### hfg-gfaj Talked to Odie (RP) about no SWIPP plans on site and no sign posted.
|
Site Preparation | 6/11/2012 | 6/12/2012 | 6/12/2012 | A | CANC |
Jim Sly
|
|
|
Odie phone
|
Site Preparation | 6/11/2012 | 6/11/2012 | 6/11/2012 | P | CANC |
Jim Sly
|
|
|
Odie phone............Re-sched........
|
Site Preparation | 5/9/2012 | 5/11/2012 | 5/11/2012 | P | PART |
Clint A Smith
|
|
|
Verbal to RP andd GC: Ammend the entrance and exit location so employees understand the entrance and the exit points on and off of the project area.
|