Site Final | 9/21/2012 | 9/21/2012 | 9/21/2012 | A | PASS |
Dixie Fellows
|
|
|
the sod is down and job complete
|
General Inspection | 9/21/2012 | 9/21/2012 | 9/21/2012 | | PEND |
Dixie Fellows
|
|
|
i will go by house and check on it
|
General Inspection | 8/21/2012 | 8/21/2012 | 8/21/2012 | | PART |
Clint A Smith
|
|
|
Daily clean up needed.
|
BMP Violation | 7/17/2012 | 7/20/2012 | 7/20/2012 | P | PASS |
Kimberly M. Johnson
|
|
|
Met with RP on site during follow up inspection. Perimeter control has been replaced but has not been installed correctly. RP to correct. Observed RP sweep street along curb where some sediment and debri has deposited from track out.
|
Random Inspection | | | 7/16/2012 | P | FAIL |
|
|
|
Perimeter BMPs need maintenance. Construction materials and portapot needs to be moved off of the sidewalk. Contractor was not on site at time of inspection. Telephoned RP on 7/18 to ask for corrections. RP indicated that the perimeter controls would be corrected and/or replaced. Contractor will attempt to move the portapot off of the sidewalk to the level surface adjacent to power pole on the property. Contractor may need to complete driveway in order to have a large enough level surface for the portapot. Approximate time frame for completion of the driveway is two weeks.
|
BMP Violation | 6/29/2012 | 7/3/2012 | 7/5/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/29/2012 | 6/29/2012 | 6/29/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install perimeter BMP's controls along the back of sidewalk. Will follow up on 7/3/2012 PM
|
BMP Violation | 5/25/2012 | 5/29/2012 | 5/31/2012 | A | PART |
Clint A Smith
|
|
|
See history: If not completed at the time of inspection place a 24hr correction notice.
|
General Inspection | 5/22/2012 | 5/22/2012 | 5/25/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: Install new sediment barrier at the perimeter of the back of side walk at the front of the project lot. Clean up all sediment and debris off of the hard surfaces/ Will re-inspect on 5/29/2012AM.
|
Site Preparation | 4/20/2012 | 4/20/2012 | 4/20/2012 | P | PART |
Tony Young
|
|
|
|
Site Preparation | 4/19/2012 | 4/19/2012 | 4/20/2012 | P | FAIL |
Tony Young
|
|
|
need BMPs in place,, need to clean up trash
|
Site Preparation | 4/16/2012 | 4/16/2012 | | | |
Dixie Fellows
|
|
|
|