Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC12-00681
StatusFinaled
Name CRAIG FISCHER
Site Address 2850 W FLETHCER ST
Project NameGoodman Oil Demo
Customer Number 
ePlanReviewNo
Description
demo of all buildings, above ground structures and removal of foundations and site concrete. PERMIT COVERS ONLY DEMO AND REMEDIATION. MUST APPLY FOR A SEPERATE ESC PERMIT FOR CONSTRUCTION.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/7/201310/7/201310/7/2013 PASS
DetailsAndy J. Long
Finaled. See activity notes
DOC - Permit Finaled10/7/201310/7/201310/7/2013PPASS
DetailsAndy J. Long
Goodman Oil demo is complete and site is in active. Pit run and plant vegetation has stabilized soil Any new activity will require a new ESC permit.
General Inspection9/19/20139/20/20139/20/2013APASS
DetailsBill VanDegrift
BILL, THIS IS PART OF A DEMO PERMIT..IT'S NEVER BEEN INSPECTED AND I'M NOT SURE WHAT TO LOOK FOR..THANKS
General Inspection9/17/20139/17/20139/19/2013 PEND
DetailsDixie Fellows
SENT TO BILL AS I'M NOT SURE WHAT TO LOOK FOR AND THERE HAVE BEEN NO INSPECTIONS ON THE BUILDING PERMIT
General Inspection9/2/20139/2/20139/10/2013 PASS
DetailsRock A. Hudson
General Inspection8/16/20138/16/20138/20/2013 PASS
DetailsDaryl Spivey
General Inspection8/1/20138/1/20138/1/2013 PASS
DetailsKimberly M. Johnson
Has not achieved any vegetation yet. Will need to continue maintaining temp stabilization until vegetation grows in. Note: site is contoured inward; little to no risk of runoff
General Inspection7/17/20137/17/20137/17/2013 PART
DetailsClint A Smith
Has not achieved vegitation
General Inspection7/2/20137/2/20137/2/2013 PASS
DetailsClint A Smith
General Inspection6/17/20136/17/20136/17/2013 PASS
DetailsClint A Smith
General Inspection5/31/20135/31/20135/31/2013 PASS
DetailsClint A Smith
General Inspection5/16/20135/16/20135/17/2013 PASS
DetailsKimberly M. Johnson
site stabilized with temporary measures
Conference5/1/20135/1/20135/1/2013PDONE
DetailsKimberly M. Johnson
On site conference requested by Ryan. Met to discuss final stabilization options. Talked about City permit requirements versus EPA requirements for vegetative and non-vegetative stabilization.
General Inspection4/25/20134/25/20134/25/2013 PASS
DetailsClint A Smith
Conference4/9/20134/10/20134/10/2013ADONE
DetailsClint A Smith
Gave the options to the RP with Warner Construction on how to tranfer their ESC and CGP permits. Explained first, they must stabilize all disturbed soil (pitrun) prior to conducting the tranfering of the permits to a different party.
General Inspection4/2/20134/2/20134/2/2013 PASS
DetailsClint A Smith
Site Preparation3/1/20133/18/20133/18/2013APASS
DetailsClint A Smith
Work under the re mitigation portion of the project phase.
General Inspection3/1/20133/1/20133/1/2013 DONE
DetailsClint A Smith
Site will become active in 13 days from todays date. Will re-inspect on 3/18/2013
General Inspection2/14/20132/14/20132/14/2013 PASS
DetailsClint A Smith
NO activity
General Inspection1/30/20131/30/20131/30/2013 DONE
DetailsClint A Smith
No activity
General Inspection1/15/20131/15/20131/15/2013 PART
DetailsClint A Smith
NO activities occuring but sediment controls inplace.
General Inspection12/31/201212/31/201212/31/2012 PART
DetailsClint A Smith
No activity.
General Inspection12/14/201212/14/201212/14/2012 PART
DetailsClint A Smith
Starting the mitagation work with stockpiling of the replacement fill material.
General Inspection11/29/201211/29/201211/29/2012 DONE
DetailsClint A Smith
No activity at this time. Project will become active in the next week to begin the remove and dispose the contaminated soil. After all contaminated soil is removed, it has been instructed by DEQ to back fill using pit run and with compacted lifts.
General Inspection11/14/201211/14/201211/14/2012 PASS
DetailsClint A Smith
General Inspection10/30/201210/30/201210/30/2012 PART
DetailsClint A Smith
Waiting on the mitagation work to continue after the artifact screening in complete.
General Inspection10/12/201210/12/201210/12/2012 PASS
DetailsKimberly M. Johnson
General Inspection9/27/20129/27/20129/27/2012 PART
DetailsClint A Smith
Still mitigating the property.
General Inspection9/12/20129/12/20129/12/2012 PART
DetailsClint A Smith
Still exploring for artifacts on multiple locations on the project.
General Inspection8/28/20128/28/20128/28/2012 PASS
DetailsClint A Smith
Waiting on the remedigation work to occur.
General Inspection8/10/20128/10/20128/10/2012 PART
DetailsClint A Smith
Most of the demo work is complete. The contractor is starting to begin the removal the contaminated soil. Once that is complete, they will begin the mitagation process.
General Inspection7/19/20127/26/20127/26/2012APART
DetailsClint A Smith
General Inspection7/18/20127/18/20127/19/2012 PART
DetailsClint A Smith
Verbal to RP:
Install stabilized construction exits at the two locations where there is established accesses. Also contact the erosion control dept. with updates on the schedule of the project due to the midigation activities with the removal of contaiminated soils. Will follow up in one week.