Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC12-00972
StatusFinaled
Name JUSTIN FOSTER
Site Address 4717 W WILLOW LN
Project NameLANEY GREENS
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/7/20147/7/20147/7/2014 DONE
DetailsEvan Jenkins
see final
DOC - Permit Finaled7/7/20147/7/20147/7/2014PPASS
DetailsEvan Jenkins
Subdivsion 95% built out. Only one home being completed to finish all 17 lots.
no esc issues
permit still open on house being constructied
Aging Inspection5/5/20145/5/20145/5/2014 PASS
DetailsEvan Jenkins
Aging Inspection3/3/20143/3/20143/3/2014 CANC
DetailsEvan Jenkins
esc group out of town
Aging Inspection1/1/20141/1/20141/2/2014 CANC
DetailsEvan Jenkins
holiday
Tracking Control11/1/201311/1/201311/1/2013AFAIL
DetailsAndy J. Long
Empty lot where subdivision wash out is needs construction entrance. Track out onto sidewalk, street and strip of porous concrete. Called RP to provide verbal correction notice.
General Inspection9/23/20139/23/20139/23/2013 PASS
DetailsAndy J. Long
General Inspection7/22/20137/22/20137/22/2013 PASS
DetailsKimberly M. Johnson
Very clean. Washout in good condition. Lots not stabilized.
Complaint Inspection5/21/20135/22/20135/29/2013ACANC
DetailsClint A Smith
Follow up on BMP of pourous pavement.
Complaint Inspection5/21/20135/21/20135/21/2013APART
DetailsClint A Smith
LEft a message for RP to concat me over the BMP application for what he implimented for the pourous pavement. Track out in is very minor and no drainage or storm drain structures are threatened. Will follow up on the BMP selection tomorrow.
BMP Violation4/9/20134/12/20134/15/2013APASS
DetailsClint A Smith
General Inspection4/9/20134/9/20134/9/2013 FAIL
DetailsClint A Smith
VErbal to RP;
Re establish a proper concrete washout. Must be lined with visquen. Remove the exsisting washout area and replace it with the approved method. Will re-inspect on 4/12/2013
General Inspection1/30/20132/4/20132/4/2013APASS
DetailsClint A Smith
Conference1/30/20131/30/20131/30/2013AFAIL
DetailsClint A Smith
Verbal corrections to the RP(Justin w/ Gully Excavation);
Extent the sediment barrier within the south section of the project along the Boise River.
Delinate the construction exit to utilize the the 50ft portion of the exit. Will follow up on 2/4/2013 for corrections.
General Inspection1/9/20131/9/20131/9/2013 PASS
DetailsClint A Smith
Have just begun the project. The only activity that is complete is minor clearing and grubing. No threats of discharges coming off of the project area