Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberESC13-00250
StatusFinaled
Name JOHN OLSON
Site Address 3150 W MAIN ST
Project NameDemolition
Customer Number 
ePlanReviewNo
Description
Comercial building
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection11/13/201311/13/201311/13/2013 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled11/13/201311/13/201311/13/2013PPASS
DetailsAndy J. Long
No further construction activity, project permits already finaled. Demolished building footprint is stabilized with pit run and river rock/gravel material. Not suitable for revegetation. No further ESC inspections required.
General Inspection10/29/201310/29/201310/29/2013 PASS
DetailsAndy J. Long
General Inspection10/11/201310/11/201310/11/2013 PASS
DetailsAndy J. Long
No changes since prior inspection. Disturbed earth is stabilized by pit run, but there is still disturbed earth surrounded by asphalt parking lot. People are driving on the dirt bringing some track out.. Need to discuss whether permit should be finaled.
General Inspection9/26/20139/26/20139/26/2013 FAIL
DetailsAndy J. Long
Demolition complete and BLD, MIS permits are finaled. The building site is still unstabilized, yet contained within the paved parking lot with on-site drainage still protected. More of a fugitive dust potential than sediment in dry conditions. Site should be stabilized unless plans are in works to develop soon.
General Inspection9/11/20139/11/20139/13/2013 PASS
DetailsBill VanDegrift
Site Final8/8/20138/8/20138/8/2013PFAIL
DetailsKimberly M. Johnson
andrea Phone #: ###-####. Cannot final ESC permit until site meets final stabilization requirements or a new permit is issued for the disturbed area.
General Inspection8/1/20138/1/20138/1/2013 PASS
DetailsKimberly M. Johnson
Inlet protection still in good shape. building demo close to complete; still actively working disturbed areas.
General Inspection7/17/20137/17/20137/17/2013 PASS
DetailsClint A Smith
General Inspection7/1/20137/1/20137/1/2013 PASS
DetailsClint A Smith
MOst of the work is compplete
General Inspection6/14/20136/14/20136/16/2013 PASS
DetailsClint A Smith
General Inspection5/24/20135/24/20135/28/2013 PASS
DetailsKimberly M. Johnson
Inlet protection all in good condition (Approx 0.6" rain over last 48 hours).
General Inspection5/9/20135/9/20135/9/2013 PASS
DetailsClint A Smith
All BMP's inplace
Site Preparation4/8/20134/23/20134/23/2013ANR
DetailsClint A Smith
Have not begun
Conference4/8/20134/8/20134/8/2013ADONE
DetailsClint A Smith
Work will not begin on the project except for BMP installation due to the NOI being submitted today. Operator will be waiting 14 calender days. Discussed over sediment controls and where the location of the fueling area will be relocated then where the map indicated.
Site Preparation4/8/20134/8/20134/8/2013 CANC
DetailsClint A Smith
Moved to a confrence
General Inspection8/23/20138/23/2013   
DetailsDave Hannah