General Inspection | 11/13/2013 | 11/13/2013 | 11/13/2013 | | PASS |
Andy J. Long
|
|
|
Finaled.
|
DOC - Permit Finaled | 11/13/2013 | 11/13/2013 | 11/13/2013 | P | PASS |
Andy J. Long
|
|
|
No further construction activity, project permits already finaled. Demolished building footprint is stabilized with pit run and river rock/gravel material. Not suitable for revegetation. No further ESC inspections required.
|
General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | | PASS |
Andy J. Long
|
|
|
No changes since prior inspection. Disturbed earth is stabilized by pit run, but there is still disturbed earth surrounded by asphalt parking lot. People are driving on the dirt bringing some track out.. Need to discuss whether permit should be finaled.
|
General Inspection | 9/26/2013 | 9/26/2013 | 9/26/2013 | | FAIL |
Andy J. Long
|
|
|
Demolition complete and BLD, MIS permits are finaled. The building site is still unstabilized, yet contained within the paved parking lot with on-site drainage still protected. More of a fugitive dust potential than sediment in dry conditions. Site should be stabilized unless plans are in works to develop soon.
|
General Inspection | 9/11/2013 | 9/11/2013 | 9/13/2013 | | PASS |
Bill VanDegrift
|
|
|
|
Site Final | 8/8/2013 | 8/8/2013 | 8/8/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
andrea Phone #: ###-####. Cannot final ESC permit until site meets final stabilization requirements or a new permit is issued for the disturbed area.
|
General Inspection | 8/1/2013 | 8/1/2013 | 8/1/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Inlet protection still in good shape. building demo close to complete; still actively working disturbed areas.
|
General Inspection | 7/17/2013 | 7/17/2013 | 7/17/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/1/2013 | 7/1/2013 | 7/1/2013 | | PASS |
Clint A Smith
|
|
|
MOst of the work is compplete
|
General Inspection | 6/14/2013 | 6/14/2013 | 6/16/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/24/2013 | 5/24/2013 | 5/28/2013 | | PASS |
Kimberly M. Johnson
|
|
|
Inlet protection all in good condition (Approx 0.6" rain over last 48 hours).
|
General Inspection | 5/9/2013 | 5/9/2013 | 5/9/2013 | | PASS |
Clint A Smith
|
|
|
All BMP's inplace
|
Site Preparation | 4/8/2013 | 4/23/2013 | 4/23/2013 | A | NR |
Clint A Smith
|
|
|
Have not begun
|
Conference | 4/8/2013 | 4/8/2013 | 4/8/2013 | A | DONE |
Clint A Smith
|
|
|
Work will not begin on the project except for BMP installation due to the NOI being submitted today. Operator will be waiting 14 calender days. Discussed over sediment controls and where the location of the fueling area will be relocated then where the map indicated.
|
Site Preparation | 4/8/2013 | 4/8/2013 | 4/8/2013 | | CANC |
Clint A Smith
|
|
|
Moved to a confrence
|
General Inspection | 8/23/2013 | 8/23/2013 | | | |
Dave Hannah
|
|
|
|