Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC13-00277
StatusFinaled
Name OLIVER STEIGER
Site Address 601 W GOWEN RD
Project NameWestern Power Sports Office Ad
Customer Number 
ePlanReviewNo
Description
Add 2 story, 21,591 sf office addition to existing 155,564 sf distribution & office facility.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/8/201412/8/201412/8/2014 PASS
DetailsAndy J. Long
Exterior berm and sidewalk has sufficient amount of native vegetation growing to stabilize the area. Interior berm is to be landscaped by WPS (parcel owners). No sediment leaving site, no MS4 or surface waters adjacent to site. No further ESC inspections necessary at this site. All permits finaled.
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsAndy J. Long
General Inspection10/21/201410/21/201410/21/2014 PASS
DetailsAndy J. Long
Construction activity is complete and BLD is finaled. The landscaped berm and disturbed areas have been seeded but grass/vegetation is not yet established. Will keep permit open to monitor. No ESC violations/corrections.
General Inspection9/5/20149/5/20149/5/2014 PASS
DetailsAndy J. Long
No changes or activity at WPS at time of inspection. Still awaiting final landscaping.
Conference7/21/20147/21/20147/21/2014PPASS
DetailsEvan Jenkins
Odie Phone #: ###-####
Discussed Temporary and Perminant Stablization of disturbed areas. Contractor will Tackify disturbed areas for now, and Hydroseed this fall. See will not grow in the summer heat and dry weather.
General Inspection7/4/20147/4/20147/7/2014 PASS
DetailsAndy J. Long
Western Power Sports office addition building is near completion. BLD is open. No exterior construction activity observed but some landscaping and/or stabilization of disturbed earth from construction activity to the west of the building and parking lot needs to be completed.

No violations observed.
General Inspection5/19/20145/19/20145/19/2014 PASS
DetailsEvan Jenkins
General Inspection4/1/20144/1/20144/1/2014 PASS
DetailsAndy J. Long
WIP. No sediment leaving site. No MS4 in area
General Inspection2/14/20142/14/20142/14/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
General Inspection12/30/201312/30/201312/30/2013 PASS
DetailsAndy J. Long
General Inspection11/12/201311/12/201311/12/2013 PASS
DetailsEvan Jenkins
BMP Violation9/24/20139/24/20139/24/2013APART
DetailsEric Strole
Corrections are complete and stop work has been taken off.
BMP Violation9/20/20139/25/20139/24/2013ACANC
DetailsEric Strole
BMP Violation9/23/20139/23/20139/23/2013AFAIL
DetailsEric Strole
Still washing concrete out on ground. A stop work has been issued till all concrete is cleaned up and an approved concrete washout is installed and inspected.
BMP Violation9/20/20139/20/20139/20/2013PFAIL
DetailsEric Strole
Left verbal with RP to claen up all concrete that washed out on ground and install a concrete washout by 9-23-13 pm. Will reinspect on 9-24-13 am.
General Inspection9/3/20139/3/20139/10/2013 PASS
DetailsBob Reichert
looked ok
General Inspection7/17/20137/17/20137/17/2013 PASS
DetailsClint A Smith
BMP Violation5/29/20135/31/20135/31/2013APASS
DetailsClint A Smith
General Inspection5/29/20135/29/20135/29/2013 FAIL
DetailsClint A Smith
Message to RP;
Install a stabilized construction exit. Will follow up on 5/31/2013