Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC13-00396
StatusFinaled
Name DALE PIPKIN
Site Address 406 S VICTORIA DR
Project NameDepot Lofts
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/28/201410/28/201410/28/2014PPASS
DetailsAndy J. Long
All construction at Depot Lofts is complete (2 apt. buildings, carports, garage) and construction materials have been removed from site. Temporary BMPs have been removed. Parking lot was swept clean and common areas are landscaped. ESC permit conditions satisfied.
DOC - Permit Finaled10/28/201410/28/201410/28/2014PPASS
DetailsAndy J. Long
General Inspection9/15/20149/15/20149/15/2014 PASS
DetailsAndy J. Long
Depot Lofts' buildings are complete, common areas landscaped. Some BLD permits for project are open, so will continue to inspect at this time. There is some demolition of old structures on adjacent lot that I needs investigation.
Random Inspection7/31/20147/31/20147/31/2014PPART
DetailsAndy J. Long
Depot Lofts' apartment buildings are complete and the paving and curb work has been installed in the parking loft.

Construction on The newly installed storm drain drop inlets will need protection during further construction of the 3 carports that will now be covered under this permit.


Correction:

Need to sweep parking and remove construction supplies that are no longer in use.

No discharges or erosion issues observed. Site has been landscaped.
General Inspection7/8/20147/8/20147/8/2014 PASS
DetailsEvan Jenkins
Project near completion
Parking lot has been paved. Landscaping still needs to be completed
No ESC Issues at time of inspection
General Inspection5/23/20145/23/20145/23/2014 PART
DetailsEvan Jenkins
Some minimal trackout. Talked with Contractor, he stated he has been sweeping about every two days. I told him he should sweep after each day to reduce dust. He stated he will, and that they are prepping to pave next week.
Tracking Control4/7/20144/7/20144/7/2014PPART
DetailsAndy J. Long
Some minor trackout onto Victoria. No adjacent MS4s but does need some sweeping. The parking lot is to be installed within the next 2 weeks so that will help.

Discussed issue with contractor Dan (inside trailor) who stated he will get the entrance swept and monitor track out.
Conference3/10/20143/10/20143/10/2014ADONE
DetailsEvan Jenkins
Meeting w/ Fire Dept. to discuss potential of access road for Fire Department. Also, address trackout issues and construction entrance
FIRE DEPT. DIDN'T SHOW UP. CONTRACTOR TO REINSTALL CONSTRUCTION ENTRANCE AND SWEEP TRACKOUT
General Inspection1/24/20141/24/20141/24/2014 PASS
DetailsEvan Jenkins
no violations at time of inspection
work in progress
General Inspection12/9/201312/9/201312/9/2013 PASS
DetailsEvan Jenkins
Frozen; no construction activity other than power line work
General Inspection10/22/201310/22/201310/22/2013 PASS
DetailsAndy J. Long
Does not have discharge to MS4. Permit posted. Application received prior to site prep inspection requirement. No violations at time of inspection.