Site Final | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | PASS |
Evan Jenkins
|
|
|
Minor trackout. There were 2 workers currently sweeping with hand brooms
|
General Inspection | 1/24/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Andy J. Long
|
|
|
Rescheduled from Friday 1-24
Drop inlets protected. Small amount of track out from foot traffic onto sidewalk but roads and gutters are clean. No corrections at this time.
|
General Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 | | CANC |
Andy J. Long
|
|
|
Scheduled for Monday 1-27.
|
General Inspection | 1/24/2014 | 1/24/2014 | 1/24/2014 | A | CANC |
Andy J. Long
|
|
|
duplicate entry
|
General Inspection | 12/9/2013 | 12/9/2013 | 12/9/2013 | | PASS |
Andy J. Long
|
|
|
Site has restricted access to limit foot and vehicle track out. Parking lots have been recently paved. Some stockpiles on-site. Limited activity due to snow conditions. No corrections required at this time.
|
General Inspection | 10/23/2013 | 10/23/2013 | 10/23/2013 | | PASS |
Andy J. Long
|
|
|
WIP. No corrections at this time.
|
Site Preparation | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/4/2013 | 9/4/2013 | | | |
Jim Johnson
|
|
|
|