Permit Information
Permit NumberESC13-00522
StatusFinaled
Name JIM CONGER
Site Address 5752 MILLET DR
Project NameTriplett Sub #2 Retaining Wall
Customer Number 
ePlanReviewNo
Description
retaining wall
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/28/201410/28/201410/28/2014PPASS
DetailsAndy J. Long
Retaining wall is installed and surrounding area stabilized. Drainage channel behind wall has been signed off on by Public Works. No ESC violation; permit conditions satisfied. Triplett Ranch sub permit ESC13-00259 is still open while townhomes are ongoing.
DOC - Permit Finaled10/28/201410/28/201410/28/2014PPASS
DetailsAndy J. Long
General Inspection10/7/201410/7/201410/7/2014 PASS
DetailsAndy J. Long
Near completion. Permit posted. No corrections at this time. Lined concrete washout in use, no trackout to Millet.
General Inspection8/22/20148/22/20148/22/2014 PASS
DetailsAndy J. Long
Townhome frame is up, no stucco or siding yet. Permit is posted, trash and materials are contained and no trackout or illicit discharges observed. Approved.
General Inspection7/7/20147/7/20147/7/2014 PART
DetailsAndy J. Long
Frame is up. No trackout or ESC violations. There is no trashbox so pile needs to be picked up to prevent wind carrying away litter.
General Inspection5/20/20145/20/20145/20/2014 PASS
DetailsAndy J. Long
Disturbed hillsides have vegetated. Some temp BMPs still installed for the Triplett Ranch townhomes (individually permitted). No corrections at this time.
General Inspection4/4/20144/4/20144/4/2014 PASS
DetailsAndy J. Long
Retaining wall is complete and has been approved by PW. The slope above is still in process of vegetation. Will keep open until full stabilization is accomplished.
General Inspection2/17/20142/17/20142/17/2014 CANC
DetailsEvan Jenkins
holiday
General Inspection12/31/201312/31/201312/31/2013 PASS
DetailsAndy J. Long
No further work on wall. Hillside above wall has been hydroseeded but vegetation is not yet established. Hillside has a series of berms to slow runoff. No corrections at this time.
General Inspection11/13/201311/13/201311/13/2013 PASS
DetailsAndy J. Long
Wall is constructed as east end of Millet. No permanent or temporary stabilization yet, but hill behind wall is terraced. Approved. BLD permit is open.
General Inspection9/24/20139/24/20139/24/2013 PASS
DetailsAndy J. Long
No construction work yet, sites in subdivision have BMPs implemented. No trackout observed, approved.
General Inspection8/8/20138/8/20138/9/2013 PASS
DetailsDave Hannah