Site Final | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Phil Shearer
|
|
|
|
Site Preparation | 3/17/2014 | 3/18/2014 | 3/18/2014 | A | PART |
Andy J. Long
|
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Stockpile from adjacent lot (already in progress) needs to be hauled away before further excavation. Perimeter BMPs installed, permit is posted.
Verbal CN to clean up area around washout, build a berm to prevent stormwater intrusion, and haul unused stockpiles/designate a stockpile parcel.
|