General Inspection7/8/20157/8/20157/8/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled7/8/20157/8/20157/8/2015PPASS
DetailsEvan Jenkins
Project is now complete.
Annex garage, HR are now complete as well as work along Idaho and 6th street.
Temp BMP's have been removed.
ESC Conditions Satisfied
General Inspection6/23/20156/23/20156/23/2015 PASS
DetailsEvan Jenkins
Annex Garage is complete (Both Floors), and are being parked on. Some monor work occuring along 6th St. and Main St.
No ESC issues at this time
General Inspection6/8/20156/8/20156/8/2015 PASS
DetailsEvan Jenkins
Garage WIP: No issues at this time
General Inspection5/22/20155/22/20155/22/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time. Work occuring constists of sidewalk work along 6ths st, resurfacing the 3 floor of the Annex Garage.
General Inspection5/7/20155/7/20155/7/2015 PASS
DetailsEvan Jenkins
WIP: 2nd and 3rd floors of the Annex Garages are currently under construction. Work along 6th street is also in progress.
No ESC issues at this time.
General Inspection4/22/20154/22/20154/22/2015 PASS
DetailsEvan Jenkins
WIP: contractors roto-milled the existing surface from both 2nd and 3rd level annex parking lots. Contractor preparing to resurface both parking lots. no issues so far
BMP Violation4/7/20154/7/20154/7/2015PFAIL
DetailsEvan Jenkins
3rd Floor Fugitive Dust Issues
Contractors rotomilling/resurfacing the 3rd floor annex parking area. Substantial amount of dust leaving the site, entering Idaho St.
Correction:
1.) Utilize Dust Shroud to reduce/eliminate dust that's occuring from grinding.

Contractor stated he will. Checked back in an hour, and there was no dust leaving the site.
General Inspection3/25/20153/25/20153/25/2015 PASS
DetailsEvan Jenkins
WIP: Interior of Garages were painted over the weekend it appears. Some minor interior work occuring on the first Floor (Copy Center) and along Main St.
General Inspection3/10/20153/10/20153/10/2015 PASS
DetailsEvan Jenkins
WIP: along 6th st and main.
No ESC issues at this time
General Inspection2/23/20152/23/20152/23/2015 PASS
DetailsEvan Jenkins
work has begun along 6th St. and Main. No ESC issues at this time
General Inspection2/6/20152/6/20152/6/2015 PASS
DetailsEvan Jenkins
WIP: Interior work occuring only at time of inspection. Upgrading the Copy center currently. HR area is complete along with sidewalks along Idaho. minor work occuring along 6th st.
General Inspection1/22/20151/22/20151/22/2015 PASS
DetailsEvan Jenkins
exterior work is mainly finished. internal work occuring now with concrete reinforced walls being poured
General Inspection1/7/20151/7/20151/7/2015 PASS
DetailsEvan Jenkins
WIP: no esc issues at this time
General Inspection12/23/201412/23/201412/23/2014 PART
DetailsEvan Jenkins
Curb along Idaho St. needs to be better swept. Pavers and Tree Planters have been installed last week. Concrete washout is nearly 1/4 full. no other ESC issues at this time
General Inspection12/8/201412/8/201412/8/2014 PASS
DetailsEvan Jenkins
WIP: New Drop Inlet Protection has been installed. Contractor currently sweeping along Idaho St.
General Inspection11/21/201411/21/201411/21/2014 PASS
DetailsEvan Jenkins
General Inspection11/6/201411/6/201411/6/2014 PASS
DetailsEvan Jenkins
WIP: no esc issues at this time
General Inspection10/22/201410/22/201410/22/2014 PASS
DetailsEvan Jenkins
General Inspection10/7/201410/7/201410/7/2014 PASS
DetailsEvan Jenkins
Drop Inlet Protection located on 6th St. has been replaced. No other ESC issues at this time
General Inspection9/18/20149/19/20149/19/2014APART
DetailsEvan Jenkins
Drop Inlet Protection on 6th St. Needs to be replaced. Also, during all saw cutting or concrete drilling, contractors to utilize water to reduce airborn durn during cutting. Called Bruce and left VM disclosing both issues.
I have noticed on a few occassions a significant plume of concrete dust leaving construction areas.
General Inspection9/18/20149/18/20149/18/2014 CANC
DetailsAndy J. Long
rescheduled for 9/19
General Inspection9/3/20149/3/20149/3/2014 PART
DetailsEvan Jenkins
Some minor dust being kicked up from saw cutting. disclosed to contractor to utilize water or a shop vac to keep fugitive dust to a minimum
General Inspection8/15/20148/15/20148/15/2014 PASS
DetailsAndy J. Long
City Hall renovation in progress. No discharge, significant sediment accumulations, or other violations observed. Drop inlets on 6th street have adequate protection. No corrections at this time.
General Inspection7/31/20147/31/20147/31/2014 PASS
DetailsEvan Jenkins
site is swept up looking good
General Inspection7/16/20147/16/20147/16/2014 PASS
DetailsEvan Jenkins
BMP's will need to be changed out of the Drop Inlets in a couple weeks. A worker recently swept, but will need to continue until new sidewalk is poured.
General Inspection6/27/20146/27/20146/27/2014 PASS
DetailsEvan Jenkins
no issues at time of inspection
General Inspection6/11/20146/11/20146/11/2014 PASS
DetailsEvan Jenkins
General Inspection5/23/20145/23/20145/23/2014 PASS
DetailsEvan Jenkins
No ESC Issues at time of inspection
Site Preparation4/29/20144/29/20144/29/2014PPASS
DetailsEvan Jenkins
Bruce Phone #: ###-####