Permit NumberESC14-00313
StatusFinaled
Name ROB CLONINGER
Site Address 415 E PARKCENTER BLVD
Project NameSAGE INTERNATIONAL SCHOOL
Customer Number 
ePlanReviewNo
Description
The SWPPP/ESC Plan States the total disturbed area is 2.04 acres.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/21/20148/21/20148/21/2014 PASS
DetailsAndy J. Long
Finaled.
DOC - Permit Finaled8/21/20148/21/20148/21/2014PPASS
DetailsAndy J. Long
Renovation of Parkcenter Mall for Sage school is complete. New parking lot surface and stormwater facilities are complete. Open areas are landscaped. Temp BMPs have been removed.

BLD permit still open for an interior issue; ESC conditions satisfied.
General Inspection8/6/20148/6/20148/6/2014 PASS
DetailsEvan Jenkins
work in progress.
no esc issues at this time
General Inspection7/22/20147/22/20147/22/2014 PASS
DetailsAndy J. Long
Work is ongoing for Sage Internationanl parking lot rehab and Parkcenter widening for bus turn lane.

No trackout to Parkcenter, observed use of constructed lined washout by concrete truck. No dust visible at time of inspection.

No corrections at this time.
Random Inspection7/7/20147/7/20147/7/2014PPASS
DetailsAndy J. Long
No trackout to Parkcenter observed. No dust issues at time of inspection. Site has valid permit and BMPs installed.
Complaint Inspection6/25/20146/26/20146/26/2014APART
DetailsAndy J. Long
Received complaint about lack of BMPs at Sage Elementary project on 6/25.

Walked site with RP Rob from Guho Corp. Checked all parking lot DIs and the MS4 DI on Parkcenter.
1. All bags had filter bag inlet protection.
2. Wattles are on-site to put around stockpiles, no stockpiles at time.
3. Area of disturbance where bank was demolished has 1.5-2 inch curbing above level of dirt, very little leaving area.
4. Water tank on site to control dust in bank area if necessary.
5. No concrete work yet but Rob said he would use a portable pan washout.

1 correction:

Clearly post permit sign and SWPPP

Other than that the site look good. No trackout to Parkcenter, no dewatering taking place. Approved.


General Inspection6/18/20146/18/20146/18/2014 PART
DetailsEvan Jenkins
Some minimal trackout occuring. Tree's being removed/debris. Nothing major at this time of inspection. WIll keep a close eye on it
General Inspection5/30/20145/30/20145/30/2014 PASS
DetailsAndy J. Long