Information based on query as of Tuesday, June 18, 2024.
Permit Information
Permit NumberESC14-00404
StatusFinaled
Name DON STINE
Site Address 3214 E AMITY RD
Project NameRocky Mountain Packaging
Customer Number 
ePlanReviewNo
Description
Steel building shell to interconnect two existing buildings
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/20/201510/20/201510/20/2015 PASS
DetailsAndy J. Long
Construction complete and site has been cleaned. Building tenant will remove temporary wattle once they've installed landscaping. No further ESC inspections needed.
DOC - Permit Finaled10/20/201510/20/201510/20/2015PPASS
DetailsAndy J. Long
DOC - Permit Finaled10/20/201510/20/201510/20/2015PPASS
DetailsAndy J. Long
General Inspection9/4/20159/4/20159/4/2015 PEND
DetailsEvan Jenkins
temp bmp removal
General Inspection7/20/20157/20/20157/20/2015 PEND
DetailsEvan Jenkins
Remove witches hat from drop inlet.
Remove straw waddles prior to permit being finaled.
General Inspection6/2/20156/2/20156/2/2015 PASS
DetailsEvan Jenkins
General Inspection4/17/20154/17/20154/17/2015 PASS
DetailsAndy J. Long
General Inspection3/2/20153/2/20153/2/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time
General Inspection1/13/20151/13/20151/13/2015 PASS
DetailsAndy J. Long
WIP on Rocky Mtn. Packaging expansion. Wattles protect stormwater swale and form sediment containment perimeter. Contractors parking on pavement to prevent traciout. Permit clearly posted. No corrections necessary.
General Inspection11/26/201411/26/201412/1/2014 PASS
DetailsAndy J. Long
WIP on warehouse packaging center expansion. BMPs are installed and include perimeter wattles, concrete washout, and permit signage. No trackout or sediment discharges offsite. No corrections needed at this time.
Site Preparation10/7/201410/8/201410/8/2014APASS
DetailsAndy J. Long
Don Phone #: ###-####

RP onsite with ESC plan and site map. BMPs installed per plan including inlet protection on the private onsite storm drains, straw wattle protection for the swale to the northeast of new building area.

Parking lot and staging area is mostly paved son no construction entrance/tracking pad. No MS4 in vicinity. Permit is posted on fence west of main building.

Approved for construction.