Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC14-00416
StatusFinaled
Name DONALD FLYNN
Site Address 520 E CLUBVIEW DR
Project NameSomerset Ridge #4 SFH
Customer Number 
ePlanReviewNo
Description
As per ESC conditions, ESC site map and narrative submitted and approved. BMPs include stabilized construction access off the existing driveway, wattles line the downslope of project to the southwest, designated washout area on site, and gravel bag/inlet protection in gutter. Foothills lot, but a fairly flat parcel. Site prep inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled5/7/20155/7/20155/7/2015PPASS
DetailsAndy J. Long
Debris and materials that were temporarily dumped across the street have been remove and lot has been graded. Gutter and sidewalk also swept.

ESC conditions satisfied. Permit finaled.
General Inspection4/30/20154/30/20154/30/2015 PASS
DetailsEvan Jenkins
General Inspection4/15/20154/15/20154/15/2015 FAIL
DetailsAndy J. Long
Concrete saw cutting or washout slurry was rinsed down gutter on Clubview and sealed up the full inlet bag.

Corrections:

Sweep up residue.

Shovel out and remove full drop inlet on Clubview.
General Inspection3/31/20153/31/20153/31/2015 PEND
DetailsAndy J. Long
Home is complete and landscaped.

DI bag in nearest inlet is installed and full of sand and mud.

Some of the accumulation can be attributed to winter road sand and other sources, but some of it is from site.

Will check in with Shadow Mtn. and also ACHD ESC inspector to look into maintenance.
Site Final3/16/20153/16/20153/16/2015PPEND
DetailsAndy J. Long
Landscaping and yard stabilization is near completion. Called Shadow Mtn. homes supervisor Scott to have crew remove the DI bag downhill from site on Clubview and shovel/remove the dirt/sand that was trapped.

He said he will get it done this week. Will check back when in area.

No issues or violations. Just need to remove temporary BMPs.
General Inspection3/2/20153/2/20153/2/2015 PASS
DetailsEvan Jenkins
WIP: no sediment leaving the construction site no violations at this time
General Inspection2/12/20152/12/20152/12/2015 PASS
DetailsEvan Jenkins
Minor rilling had occured during the last rain event. Contractor currenlty working on addressing it. No sediment has left the site. no issues at this time
General Inspection1/28/20151/28/20151/28/2015 PASS
DetailsAndy J. Long
Wattle trenched in along edge of paved sidewalk is doing well to keep sediment on site. No trackout. No corrections need at this time.
General Inspection1/13/20151/13/20151/13/2015 PASS
DetailsAndy J. Long
WIP on home, yard, and rock placements. No discharges or sediment runoff. No violations observed.
General Inspection12/29/201412/29/201412/29/2014 PASS
DetailsAndy J. Long
No hillside erosion issues, no sediment runoff in gutters. Down hill storm drain has DI protection and perimeter wattles installed along sidewalk at toe of slope in front of home.

WIP. Permit posted. Approved
General Inspection12/11/201412/11/201412/11/2014 PASS
DetailsEvan Jenkins
General Inspection11/26/201411/26/201412/1/2014 PASS
DetailsEvan Jenkins
Mainly work being performed inside at time of inspection. Exterior needs to have stabilization practices applied for perminant stabilization. no ESC issues observed at this time
General Inspection11/11/201411/11/201411/12/2014 PASS
DetailsAndy J. Long
BMPs including perimeter wattles, DI protection, and designated staging and trash container area are in good condition. No trackout or sediment runoff occuring. WIP on home and retaining wall.
General Inspection10/24/201410/24/201410/24/2014 PASS
DetailsAndy J. Long
Work occuring on home only - not the pool & retaining wall with the SWO. No ESC violations at site. Permit posted and BMPs installed.
General Inspection9/16/20149/16/20149/16/2014 PASS
DetailsEvan Jenkins
no issues at this time
General Inspection8/13/20148/13/20148/13/2014 PASS
DetailsEvan Jenkins
vertical construction occuring
no ESC issues observed
Site Preparation7/9/20147/9/20147/9/2014PPASS
DetailsAndy J. Long
Scott Johnson Phone #: ###-####


BMPs set up per ESC plan. Wattles are installed on edge of flat parcel and slope and are properly trenched in. Two gravel bag check dams have been placed in gutter downstream on Clubview in addition to a DI filter bag on the receiving inlet. BMPs set up by Specialty Construction which also provided an Out-Pak washout box. Approved for excavation.