Permit Information
Permit NumberESC14-00438
StatusFinaled
Name BILL HAAS
Site Address 1348 W VILLA NORTE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC conditions, New Home
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/29/201510/29/201510/29/2015 PASS
DetailsAndy J. Long
Yard and slopes have now been stabilized with a hydroseed mulch. Coverage looks very good, no sediment leaving site and no evidence of erosion rills developing. No further ESC inspection, conditions satisfied.
DOC - Permit Finaled10/29/201510/29/201510/29/2015PPASS
DetailsAndy J. Long
General Inspection10/14/201510/14/201510/14/2015 PASS
DetailsAndy J. Long
General Inspection9/29/20159/29/20159/29/2015 PASS
DetailsAndy J. Long
General Inspection9/14/20159/14/20159/14/2015 PEND
DetailsAndy J. Long
Home complete but yard not stabilized or landscaped to completion. Hillside bond by PW has be obtained and is in effect till Oct. 26. Homeowner stated they are meeting with landscape architects this week to finalize plans and is also monitoring runoff from his property to make sure it is not cause erosion/sediment runoff. No issues observed.
General Inspection8/28/20158/28/20158/28/2015 PEND
DetailsEvan Jenkins
General Inspection8/12/20158/12/20158/12/2015 CANC
DetailsAndy J. Long
General Inspection7/28/20157/28/20157/28/2015 PASS
DetailsAndy J. Long
General Inspection7/13/20157/13/20157/13/2015 PEND
DetailsEvan Jenkins
Pending Perm Vegetation re-establishment
General Inspection6/26/20156/26/20156/26/2015 PEND
DetailsEvan Jenkins
Waiting for perm re-vegetation to become established.
No ESC issues at this time
General Inspection6/11/20156/11/20156/11/2015 PASS
DetailsEvan Jenkins
No Issues at this time
General Inspection5/27/20155/27/20155/27/2015 PASS
DetailsAndy J. Long
Home complete and is to be landscaped/stabilized by homeowner. Homeowner has bond for site revegetation. No sediment leaving site or running down gutter. DI bag on Villa Norte and Highland View is still installed and should be removed upon stabilization.
General Inspection5/12/20155/12/20155/12/2015 PASS
DetailsAndy J. Long
General Inspection4/27/20154/27/20154/27/2015 PASS
DetailsEvan Jenkins
Home is complete and occupied. Disturbed areas have been prepped for landscaping/final stabilization. No ESC issues at this time
General Inspection4/9/20154/9/20154/9/2015 PASS
DetailsEvan Jenkins
WIP: BMP's still in place, permit still posted. No discharges leaving the stie
General Inspection3/25/20153/25/20153/25/2015 PASS
DetailsEvan Jenkins
WIP: Interior only at time of inspection. Permit and BMP's still in place. No discharges have occured
General Inspection3/10/20153/10/20153/10/2015 PASS
DetailsEvan Jenkins
WIP: no discharges leaving the site. BMP's in place
General Inspection2/23/20152/23/20152/23/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time
General Inspection2/6/20152/6/20152/6/2015 PASS
DetailsAndy J. Long
WIP. Wattle installed to keep dirt from unpaved driveway and small stockpile at end of street. No discharges or breaches observed.

Note - there is a lot of sand on Villa Norte from winter road safety measures (very steep street)
General Inspection1/22/20151/22/20151/22/2015 PASS
DetailsAndy J. Long
WIP. No trackout or sediment eroding off site. Lots of sand in road from winter safety precautions. No violations observed.
General Inspection1/7/20151/7/20151/7/2015 PASS
DetailsEvan Jenkins
BMP's in place. Interior work only occuring at time of inspection. No ESC Issues
General Inspection12/19/201412/19/201412/19/2014 PASS
DetailsAndy J. Long
MInor activity occuring on the interior at time of inspection. No sediment or turbid runoff during observed during the rain. Permit is posted, no trackout from vehicles, no trash or litter uncontained.

Approved.
General Inspection12/3/201412/3/201412/3/2014 PASS
DetailsEvan Jenkins
WIP: no esc issues at this time. permit and bmp's still in place
General Inspection11/14/201411/18/201411/18/2014ACANC
DetailsAndy J. Long
General Inspection11/14/201411/14/201411/14/2014 CANC
DetailsAndy J. Long
rescheduled.
General Inspection10/30/201410/30/201410/30/2014 PASS
DetailsEvan Jenkins
General Inspection10/15/201410/15/201410/15/2014 PASS
DetailsAndy J. Long
Permit posted. Wattle containing sediment onsite, no runoff or trackout onto Villa Norte. WIP. No corrections at this time.
General Inspection9/12/20149/12/20149/12/2014 PASS
DetailsEvan Jenkins
work in progress
no esc issues at this time
Site Preparation7/22/20147/23/20147/23/2014APASS
DetailsEvan Jenkins
Phone #: 8674587 >> Inspection requested via mobile web by Scott Flynn
Construction signage posted
straw waddles in place along frontage of parcel/project. Drop inlet also protected.
pass