Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC14-00567
StatusFinaled
Name BOB THORNTON
Site Address 8455 W WESTPARK ST
Project NameWestpark Industrial - demo/TI
Customer Number 
ePlanReviewNo
Description
Demo and haul off of existing building corridor; fill and cap sump inside building. ESC plan and narrative submitted and approved. BMPs include wattles to protect existing bio-infiltration swales, inlet protection on parking lot storm drains, and concrete washout. Dust suppression water should be implemented during the demolition phase.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/28/20154/28/20154/28/2015 PASS
DetailsAndy J. Long
Construction complete on warehouse TI project. Area of disturbance outside is contained within cement curbing and pathway and has been covered with bark mulch. No loose sediment or materials on site. ESC permit finaled.
DOC - Permit Finaled4/28/20154/28/20154/28/2015PPASS
DetailsAndy J. Long
General Inspection2/23/20152/23/20152/23/2015 PASS
DetailsEvan Jenkins
General Inspection12/22/201412/22/201412/22/2014 PASS
DetailsEvan Jenkins
General Inspection10/17/201410/20/201410/20/2014APASS
DetailsAndy J. Long
Warehouse demo & new addition is in progress. No disturbed area or loosed sediment on front of building on Westpark. Permit is posted with contact info. The rear parking lot to the south has had some trench work that is not yet patched over so there is some loose sediment. The grassy swale inlet has sandbag to collect dirt. No trackout. Will be swept after paving.

Site is in compliance with permit conditions.
General Inspection10/16/201410/16/201410/17/2014 CANC
DetailsAndy J. Long
rescheduled for 10/20