Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberESC14-00713
StatusFinaled
Name ROBERT FELDMANN
Site Address 119 S 10TH ST
Project Name10th and Grove Condos
Customer Number 
ePlanReviewNo
Description
To construct the footings, foundations, shear walls, slab on grade, and 3-hr fire-resistance-rated standard reinforced slab for a 2 story garage and residential apartment building (two story garage at grade and 4 stories of wood framed residential apartments above). The residential residential portion of the building will be submitted under separate permit. Site grading, landscaping and streetfront improvments are also included.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/30/20159/30/20159/30/2015PPASS
DetailsAndy J. Long
Foundation and canal bridge phase complete. Vertical work on 119 Grove condos is in progress. Work now inspected under ESC14-00928
General Inspection8/24/20158/24/20158/24/2015 PASS
DetailsEvan Jenkins
Random Inspection7/9/20157/9/20157/9/2015PPASS
DetailsAndy J. Long
No trackout or muddy discharges observed at site after significant rain storm yesterday eve. Stockpiles, loose dirt, and other materials has stayed within the curbed area of construction.
General Inspection6/26/20156/26/20156/26/2015 PASS
DetailsAndy J. Long
Permit sign clearly posted on security fence at entrance. Construction activity remaining confined to building footprint. No trackout to 10th or Grove Street. No fugitive dust or discharges observed. Still working on foundation.
Random Inspection5/11/20155/11/20155/11/2015PPASS
DetailsAndy J. Long
WIP on foundation. Site has small footprint within downtown parcel. Rebuilding MS4 on 10th, so no inlet protection. No trackout or discharges. Permit sign posted. No corrections at this time.
Site Preparation4/15/20154/15/20154/15/2015PPART
DetailsEvan Jenkins
Mike Phone #: ###-####

Construction/grading has already commenced prior to site prep inspection. Contractor to keep sediment off sidewalk (which is closed) and remove Porta-Pot from ACHD's ROW