Permit Information
Permit NumberESC14-00908
StatusFinaled
Name JIM COX
Site Address 1770 N FISK ST
Project NameFisk Well Treatment project
Customer Number 
ePlanReviewNo
Description
Commercial demolition and tenant improvement for United Water to install granular activated carbon filters to existing pump house at site. ESC plan and narrative submitted and approved. ESC permit can be used for demo and vertical construction. BMPs include perimeter wattles, lined/leakproof concrete washout, trackout prevention & cleanout, and inlet protection for MS4 on Fisk and Russett. Site is flat and relatively low risk, though it is adjacent to the Tuttle Lateral irrigation ditch. Dust suppression (water hose/truck) will be required during the demolition phase.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/15/20156/15/20156/15/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled6/15/20156/15/20156/15/2015PPASS
DetailsEvan Jenkins
Project Complete
ESC Conditions Satisfied
General Inspection4/29/20154/29/20154/29/2015 PASS
DetailsAndy J. Long
Well treatment plant is in progress. Well building is mostly complete. Grounds and parking area are still undeveloped. Construction rock is placed at the entrance to prevent trackout.

No discharges or sediment leaving site. Materials and waste is contained, no dust or other issues. No corrections needed at this time.
Aging Inspection3/10/20153/10/20153/10/2015 PASS
DetailsAndy J. Long
WIP. Water treatment and filter station walls are constructed. No trackout to Fisk or loose sediment leaving site. No MS4 system on Fisk, but sheet flow goes to Fairview inlets. The canal is protected and currently not flowing.

No corrections.