Permit NumberESC14-00941
StatusFinaled
Name BRIAN MURPHY
Site Address 1600 W GOWEN RD
Project NameSkyWest Maintenance Hangar
Customer Number 
ePlanReviewNo
Description
A new aircraft maintenance hangar with office space and warehouse space attached. Sitework includes utilities, parking, airplane apron, and landscaping
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection3/14/20163/14/20163/14/2016 PASS
DetailsAndy J. Long
Work complete and hangar is occupied. Hydroseeded areas are now established and permanent onsite stormwater facilities are in place. No corrections, permit conditions satisfied. All permits finaled.
DOC - Permit Finaled3/14/20163/14/20163/14/2016PPASS
DetailsAndy J. Long
General Inspection2/11/20162/11/20162/11/2016 PASS
DetailsAndy J. Long
General Inspection1/11/20161/11/20161/11/2016 PASS
DetailsAndy J. Long
General Inspection12/10/201512/10/201512/10/2015 PASS
DetailsAndy J. Long
revegetation of hydroseeded areas in progress. No trackout or sediment leaving site.
General Inspection11/9/201511/9/201511/10/2015 PASS
DetailsAndy J. Long
General Inspection10/8/201510/8/201510/8/2015 PASS
DetailsAndy J. Long
WIP around hangar site. No trackout, fugitive dust, or discharges observed. Disturbed areas have been tacified and seeded. No significant growth yet. No corrections needed.
General Inspection9/7/20159/7/20159/8/2015 PASS
DetailsAndy J. Long
Construction complete. Open areas have been hydoseeded and are establishing. BLD with project is finaled. Will final seperate TI with ESC permit ESC14-01128.

No trackout, fugitive dust, or other issues. Hangar is occupied.
General Inspection8/6/20158/6/20158/6/2015 PASS
DetailsAndy J. Long
WIP on hangar interior and also site improvements. No trackout, fugitive dust, or erosion issues on site.
General Inspection7/6/20157/6/20157/6/2015 PASS
DetailsAndy J. Long
General Inspection6/5/20156/5/20156/5/2015 PASS
DetailsEvan Jenkins
General Inspection5/5/20155/5/20155/5/2015 PASS
DetailsAndy J. Long
Skywest Hangar construction continues. Interior work and site development and preparation of taxi runway has started staging. No trackout from site, no fugitive dust observed from active stockpiles. Approved.

See also ESC14-01128
General Inspection4/2/20154/2/20154/2/2015 PASS
DetailsAndy J. Long
Work on hangar is in progress. Site grading is complete, no stabilization has occured yet - no wind blown dust or fugitive dust has not become an issue - but will need to be considered as conditions become hotter & drier. No trackout, permit posted, silt fence perimeter installed in the direction of sheet flow and airport drainage system.