Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberESC14-01059
StatusFinaled
Name BUZZ BAKER
Site Address 2500 W BOISE AVE
Project NameVedic Cultural Center Phase 1
Customer Number 
ePlanReviewNo
Description
Construction of 1,375 S.F. structure consisting of 2 dwelling units and a conditioned greenhouse.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection6/27/20166/27/20166/27/2016 PASS
DetailsAndy J. Long
All disturbed area during construction is now stabilized. Permeable pavers installed in parking lot. No temp BMPs remaining. ESC permit condtions satified. BLD open for minor corrections.
DOC - Permit Finaled6/27/20166/27/20166/27/2016PPASS
DetailsAndy J. Long
Random Inspection4/26/20164/26/20164/26/2016PPASS
DetailsAndy J. Long
Project is near completion with several phases complete. No trackout or discharges observed. Permit posted. Approved.
Tracking Control3/21/20163/24/20163/24/2016PPASS
DetailsAndy J. Long
Follow up on correction request issued Monday 3/21

Trackout cleaned up
Aging Inspection3/21/20163/21/20163/21/2016 PART
DetailsAndy J. Long
Request to clean up trackout in Boise Ave bike lane. RP stated he will have it swept up, but also stated he feels the trackout is from Dibble Excavation working on a BSU parcel.

Will check for cleanup later this week and follow with involved parties as necessary.
Aging Inspection1/18/20161/18/20161/19/2016 PASS
DetailsAndy J. Long
WIP. Site staging area and entrance is free of loose dirt or other materials. No trackout, no discharges offsite. No corrections issued.
Tracking Control11/18/201511/18/201511/19/2015PPART
DetailsAndy J. Long
No significant trackout occuring at time of inspection.

Correction request issued via phone to RP Buzz
Baker to clean up the paved entrance area of loose mud and sediment. Suggested a designated parking area for workers in a clean area. RP will work on cleaning and organizing the staging area.

Will check pack next week.
Aging Inspection11/16/201511/16/201511/16/2015 PASS
DetailsAndy J. Long
WIP. Materials and washout are contained on site. No discharges or trackout from site. No issues.
Conference9/15/20159/15/20159/15/2015PPASS
DetailsAndy J. Long
conference to review BMPs for next phase requested by Buzz 4 PM

Existing asphalt entrance from Boise Avenue will remain. MS4 near entrance is above grade from site drainage area and is large crate. Sediment protection will be regular sweeping of the existing asphalt used as construction entrance. On site storm drains are to be demolished and replaced by permeable pavers in a later phase. During construction water ponds on site and infiltrates in the sandy material.

Approved. WIP. Provided new ESC permit sign, old one got wet/faded

Concrete washouts

Aging Inspection7/29/20157/29/20157/29/2015 PASS
DetailsEvan Jenkins
Structure near completion: WIP: funning plumming from Boise Ave. Trenching occuring. Few minor stockpiles in vacant lot. No discharge at this time
Aging Inspection5/28/20155/28/20155/28/2015 PASS
DetailsEvan Jenkins
Site Preparation12/11/201412/11/201412/11/2014PPASS
DetailsEvan Jenkins
Buzz Phone #: ###-####
Permit Posted along East Side Chainlink Fence next to project. Concrete washout is an Outpack washout. Lot is flat. No esc issues at this time