Permit Information
Permit NumberESC15-00336
StatusFinaled
Name KENNETH R SCAGGS
Site Address 1357 N FIVE MILE RD
Project NameCordillera Subdivision #2
Customer Number 
ePlanReviewNo
Description
Constists of 7 Residential Apartment Buildings, 6 two-story townhouses, site improvements. Sewer & water mains, stormwater infrastructures, irrigation, concrete curbs, roads and landscaping
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/26/20169/30/20169/29/2016ACANC
DetailsAndy J. Long
Project finaled 9/28
Site Final9/28/20169/28/20169/28/2016PPASS
DetailsAndy J. Long
Cordillera #2 subdivison and 6-plex construction is complete. Landscaping and irrigation installed. No remaining temp BMPs in municipal storm drain.

Private storm drains within site and final sweeping of landscaping gravel to be completed by the apartment management company. Units now occupied. No construction materials or stockpiles on site.

All permits finaled.
General Inspection9/26/20169/26/20169/26/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection8/9/20168/9/20168/9/2016 CANC
DetailsAndy J. Long
General Inspection6/24/20166/24/20166/24/2016PPASS
DetailsEvan Jenkins
No issues observed at this time
General Inspection5/30/20165/30/20165/30/2016 CANC
DetailsEvan Jenkins
Holiday
General Inspection4/12/20164/12/20164/12/2016 PASS
DetailsAndy J. Long
WIP on last building of Cordillera #2. Stormwater from area of construction drains to onsite DIs with sediment filter bags installed.

No trackout to Five Mile, no windblown trash or materials leaving project area.

Will need to do final sweep up and removal of temp BMPs to get ESC final.

Note: Andersen Construction no longer on job, now Summit Development. .
General Inspection2/26/20162/26/20162/26/2016 PEND
DetailsEvan Jenkins
more street sweeping needs to occur and temp bmp removal
General Inspection1/11/20161/11/20161/12/2016 FAIL
DetailsAndy J. Long
Loose dirt and trackout all over parking and access road through Cordillera #2. Trash and litter is also uncontained in the parking lot area.

DI bag installed in Cordillera #1 is full and needs to be replaced as it still receives drainage from phase 2.

Needs sweeping and trash clean ASAP. Sweep up trackout to bike lane on Five Mile.

General Inspection11/24/201511/24/201511/27/2015 PASS
DetailsAndy J. Long
WIP on phase #2 townhomes (7) at Cordillera. Stormwater infrastructure installed and is retained on site. Private stormdrains have sediment bags installed.

Landscaping and irrigation installation in progress, with some loose dirt with construction area. Currently frozen, will need to be swept as work is resumed and completed. No trackout or dishcarges observed.
General Inspection10/8/201510/8/201510/8/2015 PASS
DetailsAndy J. Long
WIP on 4-plex foundations at Cordillera #2. Parking lot and utilities already installed. No trackout or discharges offsite. No material spills on parking lot observed. Trash contained. No corrections at this time.
Aging Inspection8/21/20158/21/20158/21/2015 PASS
DetailsAndy J. Long
Parking/access road are complete as well as sidewalks, gutters and stormdrains. No vertical construction. No discharges or trackout. Approved.
Random Inspection5/19/20155/19/20155/19/2015PPASS
DetailsAndy J. Long
WIP on Cordillera #2. No trackout to Fivemile or discharges offsite. BMPs installed. No corrections.
Site Preparation3/30/20153/31/20153/31/2015APASS
DetailsEvan Jenkins
Permit Posted, Straw waddles are almost installed completely. Ken will be getting a water truck to keep onsite to keep fugitive dust to a minimum. SWO removed. Clear to begin work.
Stop Work Order3/31/20153/31/20153/31/2015APASS
DetailsEvan Jenkins
Mass Grading occured prior to issuence of permits. This occured on 3-25-15. Site prep inspection shedualed for 3-31-15