Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberESC15-00422
StatusFinaled
Name BARRY WILLOUGHBY
Site Address 7410 W SAXTON DR
Project NameThe Kensington Apartments at N
Customer Number 
ePlanReviewNo
Description
A: 323 unit multi-family development with clubhouse, pool, activity center, and playground. (11 PERMITS TOTAL FILED UNDER BLD15-01107 IN EPLANREVIEW - CLUBHOUSE BUILDING/FOUR GAZEBOS/TRASH ENCLOSURE) Submittal #1 includes Clubhouse/Four Gazebos/Trash Enclosure, Activity Center, Fireplace Pavilion, Apartment Building Q, Apartment Building P, Apartment Building O, Apartment Building M, Apartment Building U, Apartment Building T, Apartment Building V, Apartment Building W. Future submittals will include additional buildings.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled8/11/20168/11/20168/11/2016PPASS
DetailsAndy J. Long
ESC inspection activity covered under main site permit for Kensington, see ESC15-00504. This is a no fee permit
General Inspection7/28/20167/28/20167/28/2016 PASS
DetailsEvan Jenkins
work is in progress. no esc issues observed at this time
General Inspection7/13/20167/13/20167/13/2016 PASS
DetailsEvan Jenkins
Work Continues. Majority of internal roads, sidewalks, curbs are poured and paved. No trackout of other ESC issues observed at this time.
General Inspection6/28/20166/28/20166/28/2016 PASS
DetailsEvan Jenkins
Majority of internal roads paved and sidewalks poured. WIP: no ESC issues observed at this time.
General Inspection6/13/20166/13/20166/13/2016 PASS
DetailsAndy J. Long
General Inspection5/27/20165/27/20165/27/2016 PASS
DetailsAndy J. Long
General Inspection5/12/20165/12/20165/12/2016 CANC
DetailsAndy J. Long
General Inspection4/27/20164/27/20164/27/2016 PASS
DetailsEvan Jenkins
General Inspection4/12/20164/12/20164/12/2016 CANC
DetailsAndy J. Long
General Inspection3/28/20163/28/20163/28/2016 PASS
DetailsEvan Jenkins
Saxton Dr. has been swept since Friday's issues. WIP: no issues ovbserved at this time
General Inspection3/11/20163/11/20163/11/2016 CANC
DetailsAndy J. Long
General Inspection2/25/20162/25/20162/25/2016 CANC
DetailsEvan Jenkins
General Inspection2/10/20162/10/20162/10/2016 PART
DetailsAndy J. Long
Need to sweep shoulders of road on Gary and control access to site from the Saxton entrances.

Going to site walk through inspection tomorrow.
General Inspection1/26/20161/26/20161/26/2016 PASS
DetailsAndy J. Long
WIP. No violations at time of inspection.
General Inspection1/11/20161/11/20161/12/2016 PART
DetailsEvan Jenkins
Trackout noto Saxton needs swept
General Inspection12/25/201512/25/201512/28/2015 CANC
DetailsAndy J. Long
General Inspection12/10/201512/10/201512/10/2015 PASS
DetailsEvan Jenkins
General Inspection11/25/201511/25/201511/25/2015 PASS
DetailsAndy J. Long
Approved for construction. Concrete to be poured weather permitting next week. Central designated concrete washouts provided. RP Barry with Bach Homes will add angular rock to construction entrance(s). DI bags on Gary and Saxton are installed. Will install additional control on south side of Saxton . Approved. See also main site ESC permit ESC15-00504. 6 of the individual building unit ESC permits are now issued. There is a total of 31.
General Inspection11/10/201511/10/201511/10/2015 PASS
DetailsEvan Jenkins
Grading still occuring at this time. Did not see any ESC violations during inspection.