Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberESC15-00545
StatusFinaled
Name MICHAEL MCHARGUE
Site Address 9839 W CABLE CAR ST
Project NameUnion Square Office Bldg. #1
Customer Number 
ePlanReviewNo
Description
Shell & Core Office Building: (Union Square – Office Building) - Grading permit to excavate, grade and compact site earth materials in preparation for a new shell building to be constructed under BLD15-01392.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled4/19/20164/19/20164/19/2016PPASS
DetailsAndy J. Long
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
General Inspection3/18/20163/18/20163/18/2016 CANC
DetailsEvan Jenkins
General Inspection2/1/20162/1/20162/1/2016 PASS
DetailsEvan Jenkins
Random Inspection12/15/201512/15/201512/15/2015PPASS
DetailsAndy J. Long
WIP. All DIs (MS4 & new private) have sediment bag protection. No significant trackout from site entrances. Concrete washout was utilized. Permit signs posted at job trailer. No corrections issued at this time. Will need to make sure temp BMPs are removed from MS4 inlets on Overland, Goldking, and Cable Car.
General Inspection11/4/201511/4/201511/4/2015 PASS
DetailsAndy J. Long
WiP on Union Square retail building. Silt fence sediment control installed along Overland, parking lot/access drive is not asphalt so no trackout issues. DI bags on Cable Car have inlet protection. No spills or discharges observed around site, trash and materials are contained. No corrections requested at this time. Approved.
Random Inspection9/14/20159/14/20159/14/2015PPART
DetailsAndy J. Long
WIP on frame for building shell. Site has been graded and utilities installed. No permanent stabilization yet, but no trackout, fugitive dust, or sediment runoff occuring.

Perimeter sediment control silt fence is properly trenched and keeping sediment on site to the south along Overland. All surrounding DIs have sediment bags installed. Permits and SWPPP information posted. Rock construction entrance installed at east end of site by active building work. West entrance has been filled in with dirt and currently open to use. Some minor trackout occuring.

1 correction:
- Install stabilized entrance, restrict access, or provide schedule of paving/stabilization.
Site Preparation8/4/20158/4/20158/4/2015PPASS
DetailsMike Jordan
Site Preparation7/30/20157/30/20157/30/2015PPASS
DetailsEvan Jenkins
Mike Phone #: ###-####

Permit Posted
Water truck is currently on the move
Perimeter Controls installed correctly
Approved to begin construction
Random Inspection7/15/20157/15/20157/15/2015PPASS
DetailsAndy J. Long
No activity at Union Square commercial site, though it has been graded. BMPs installed, permit sign posted. No discharges, no significant trackout, and no fugitive dust observed at time of inspection.