Permit Information
Permit NumberESC15-00623
StatusFinaled
Name JOHN SEIDL
Site Address 510 W PASO FINO DR
Project NameHackberry Ranch lot #14 SFH
Customer Number 
ePlanReviewNo
Description
New foothills home and 2-tier retaining walls in front and back of home. ESC narrative and site map submitted for walls and SFH. SFH permit will be seperate BLD15-01528 but covered under this ESC permit. Workers to park on Paso Fino to prevent trackout, stabilzed entrance required for deliveries. Home to be constructed on native soils of silt and sand. A combination of silt fence and wattles will be installed prior to excavation to contain sediment on site and protect the Hackberry Ranch drainage system. Maintain previously installed drop inlet filter bags. Site Prep inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/13/20169/13/20169/13/2016 PASS
DetailsAndy J. Long
Home complete and occupied. Hillsides have been vegetated. No DI bag removal required due to new projects just activated across the street and downhill from the home. HIllside bond issued for permanent vegetation and stabilization. No further ESC inspections required, conditions satisfied.
DOC - Permit Finaled9/13/20169/13/20169/13/2016PPASS
DetailsAndy J. Long
General Inspection8/26/20168/29/20168/29/2016PCANC
DetailsAndy J. Long
data entry error. no inspection.
General Inspection8/26/20168/26/20168/29/2016 CANC
DetailsAndy J. Long
General Inspection8/11/20168/11/20168/11/2016 PASS
DetailsEvan Jenkins
General Inspection7/27/20167/27/20167/28/2016 CANC
DetailsAndy J. Long
General Inspection7/12/20167/12/20167/12/2016 PEND
DetailsEvan Jenkins
re-veg disturbed areas.
No discharges leaving the site at this time.
General Inspection6/27/20166/27/20166/27/2016 PASS
DetailsEvan Jenkins
WIP: No issues observed at this time
General Inspection6/10/20166/10/20166/10/2016 CANC
DetailsAndy J. Long
General Inspection5/26/20165/26/20165/26/2016 CANC
DetailsAndy J. Long
Random Inspection5/11/20165/11/20165/11/2016PPART
DetailsAndy J. Long
Home structure is complete but yard and driveway are not yet installed. Workers building landscape retaining wall on front slope. No significant trackout, perimeter wattle is installed around site, and most of the front slope is not disturbed.

Corrections needed:
- DI bags next to driveway exit are full and need to be changed.
- Need to clean up minor blowout at the low corner of the lot and re-install wattle.
- Connect roof drains if not all ready or install slope drain. May consider a hydromulch/tacifier on the area where erosion is occurning.
General Inspection5/4/20165/4/20165/4/2016 PASS
DetailsEvan Jenkins
WIP: no esc issues observed at this time
General Inspection4/19/20164/19/20164/20/2016 PASS
DetailsEvan Jenkins
re-veg needs to occur along with final stabilization. driveway also needs to be poured
General Inspection4/4/20164/4/20164/4/2016 PASS
DetailsAndy J. Long
Perimter wattles keeping sediment on site, some minor erosion rills within parcel and on adajacent parcel to the right of the hose will need to be re-graded/raked out prior to putting down hydorseed.

No trackout, no discharges from site. Need to empty trash bin and also make sure that when the curb is cut for the driveway that the cooling water slurry is captured and treat as much as is practical.
General Inspection3/18/20163/18/20163/18/2016 PASS
DetailsEvan Jenkins
General Inspection3/3/20163/3/20163/3/2016 PASS
DetailsEvan Jenkins
construction continues.
No ESC violations/issues observed at time of inspection
General Inspection2/17/20162/17/20162/17/2016 PASS
DetailsDaryl Spivey
General Inspection2/2/20162/2/20162/2/2016 PASS
DetailsAndy J. Long
BMPs installed properly. WIP with regular housekeeping. Approved.
General Inspection1/15/20161/18/20161/19/2016APART
DetailsAndy J. Long
Perimeter BMPs installed, no sediment runoff from site. Trash and materials are contained.

Trackout from grading equipment and loading/unloading should be swept up this week. Down hill storm drains have sediment protection installed.
General Inspection1/15/20161/15/20161/15/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection12/25/201512/25/201512/28/2015 CANC
DetailsAndy J. Long
Christmas holiday
General Inspection12/9/201512/9/201512/9/2015 PASS
DetailsEvan Jenkins
WIP: No esc issues at this time
General Inspection11/20/201511/20/201511/20/2015 PASS
DetailsAndy J. Long
Perimeter fiber wattles installed and staked down properly. Rock construction entrance and tracking pad is effectively controlling trackout. Downstream DI has sediment filter bags.

No corrections at this time.
General Inspection10/13/201510/13/201510/13/2015PPASS
DetailsAndy J. Long
WIP. Perimeter fiber wattles are still installed and trenched in. No sediment leaving site to sidewalks or gutters.

Tracking pad BMP has been installed at entrance, permit is posted, and trash and materials are contained on site. No issues, no corrections requested. Approved.
General Inspection6/25/20156/25/20156/25/2015APASS
DetailsAndy J. Long
ESC permit sign posted. Perimeter gator guard wattle installed and working effectively. Some minor trackout on sidewalk can be swept this week during housekeeping..

No sediment leaving site. Approved.
Random Inspection5/27/20155/27/20155/27/2015APASS
DetailsAndy J. Long
Perimeter wattle and grading BMP of vegetation preservation kept all sediment on this foothills home site during the heavy Thunderstorm.

Permit sign posted, no trackout, BMPs installed. Approved.
Site Preparation5/19/20155/20/20155/19/2015APASS
DetailsAndy J. Long
John Phone #: ###-####

BMPs installed per ESC plan. Gatorgaurd wattles properly staked and backfilled installed as perimeter sediment control.

Hillside slopes have been previously hydroseeded so preservation of existing vegetation as much as possible will be a BMP.

A new driveway apron will need to be cut so I cautioned RP/GC to contain slurry. DI bags are installed.

Approved. Will start grading and earthwork for retaining walls.