Site Final | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Andy J. Long
|
|
|
Gunner Phone #: ###-####
Project complete, turf installed. Construction fencing to remain in place to allow turf to establish.
Stockpile of sand removed and swept, DI bag removed. ESC permit conditions satisfied.
|
General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Andy J. Long
|
|
|
Ann Morrison soccer field re-grading and turf installation is in progress. Turf from Basque friendly is now on Field #3 and is surrounded by security fence and already inhabited by geese. A stockpile of sand in adjacent parking lot should be removed and area swept.
Now Precision grading is working on leveling #4. No trackout from work entrance, no fugitive dust issues, permit sign is posted.
Approved.
|
General Inspection | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Andy J. Long
|
|
|
Ann Morrison Park - turf removal and grading
WIP on setting up orange perimeter fencing and tractor is removing grass on field 3. No dust or trackout. Approved.
|