Site Final | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Andy J. Long
|
|
|
New path complete and open to public. Old path area has revegetated and site is stable. No DI bags remaining on MS4 inlet on Pioneer. ESC permit satisfied.
|
Aging Inspection | 5/20/2016 | 5/20/2016 | 5/24/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on bricklaying for path. No uncontained stockpiles or materials. No muddy runoff. Section between Greenbelt and parking lot is complete. Parking lot storm drain receiving runoff from surrounding paved areas has inlet protection. No corrections issued at this time.
|
General Inspection | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Andy J. Long
|
|
|
Pioneer Path corridor is in progress. No trackout or sediment leaving construcion area. Area DIs have sediment protection due to work on the Payette Brewery project adjacent to pathway. No violations or issues observed.
|
Site Preparation | 10/15/2015 | 10/16/2015 | 10/16/2015 | A | PASS |
Evan Jenkins
|
|
|
William Phone #: ###-####
Approved for Construction
|