Site Final | 8/10/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Andy J. Long
|
|
|
All work complete, disturbed areas are now stabilized. No temp BMPs or other materials on site. All permits finaled, ESC conditions satisfied.
|
General Inspection | 7/15/2016 | 7/15/2016 | 7/18/2016 | | PASS |
Andy J. Long
|
|
|
WIP on hangar, near completion. Minimal trackout, parking lot now paved. No spills or discharges observed.
|