Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberESC16-00208
StatusFinaled
Name TREVOR JOHNSON
Site Address 826 W MAIN ST
Project NameCCDC Grove Plaza Renovation
Customer Number 
ePlanReviewNo
Description
(CCDC GROVE PLAZA RENOVATION) Permit to construct a new 578 square foot office structure and other general site improvements to the Grove Plaza. The Building Department Submittal request is associated with the renovation of the current Grove Plaza.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/18/20177/18/20177/21/2017APASS
DetailsAndy J. Long
Work complete, stabilized, and no temporary BMPs remaining. ESC permit conditions satisfied.
General Inspection7/18/20177/18/20177/18/2017 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection7/3/20177/3/20177/7/2017 CANC
DetailsMelissa Jannusch
General Inspection6/16/20176/16/20176/16/2017 PASS
DetailsAndy J. Long
General Inspection6/1/20176/1/20176/2/2017 CANC
DetailsAndy J. Long
General Inspection5/17/20175/17/20175/19/2017PPASS
DetailsAndy J. Long
General Inspection5/16/20175/16/20175/18/2017 CANC
DetailsAndy J. Long
General Inspection5/1/20175/1/20175/1/2017 PASS
DetailsAndy J. Long
General Inspection4/14/20174/14/20174/18/2017 CANC
DetailsAndy J. Long
General Inspection3/30/20173/30/20173/30/2017 CANC
DetailsAndy J. Long
General Inspection3/15/20173/15/20173/15/2017 PASS
DetailsAndy J. Long
No activity currently. Plaza bricks installed, will resume rest of project once the Centre on Grove expansion project is complete - see ESC15-01613.
General Inspection2/28/20172/28/20172/28/2017 PASS
DetailsAndy J. Long
General Inspection2/13/20172/13/20172/13/2017 PASS
DetailsMelissa Jannusch
General Inspection1/27/20171/27/20171/30/2017 CANC
DetailsAndy J. Long
General Inspection1/12/20171/12/20171/17/2017 CANC
DetailsAndy J. Long
General Inspection12/28/201612/28/201612/29/2016 CANC
DetailsAndy J. Long
General Inspection12/13/201612/13/201612/13/2016 PASS
DetailsAndy J. Long
General Inspection11/28/201611/28/201611/28/2016 PASS
DetailsAndy J. Long
General Inspection11/11/201611/11/201611/15/2016 CANC
DetailsAndy J. Long
General Inspection10/27/201610/27/201610/27/2016 PASS
DetailsAndy J. Long
General Inspection10/12/201610/12/201610/12/2016 PASS
DetailsAndy J. Long
Plaza grading and brick laying between the Grove and Main Street is complete and open to public. DI on Main has inlet bag installed for multiple projects in final stages. No fugitive dust issues, discharges or trackout from construction area. Working in the center of the Grove now for Welcome building and fountain improvements.
General Inspection9/27/20169/27/20169/27/2016 PASS
DetailsAndy J. Long
WIP on Grove Plaze resurfacining. Grading is complete, placing bricks and other surface finishes. No stockpiling or materials on surrounding streets. Inlets have filter bag. WIP
General Inspection9/9/20169/12/20169/13/2016PPASS
DetailsAndy J. Long
WIP on Grove plaza remodel. No trackout to surrounding streets, storm drain inlets on 9th and Main have sediment filter protection. No stockpiling or storage in ROW. No fugitive dust issues observed.
General Inspection9/8/20169/9/20169/9/2016PCANC
DetailsAndy J. Long
General Inspection9/8/20169/8/20169/8/2016 CANC
DetailsAndy J. Long
rescheduled
General Inspection8/24/20168/24/20168/25/2016 PASS
DetailsEvan Jenkins
Complaint Inspection6/21/20166/21/20166/21/2016PPASS
DetailsAndy J. Long
Two hoses on site for dust control. Issued warning to be proactive, RP Trevor stated that they are.

There are multiple sites and crews in Grove working with variety of potential dust creating activities. RP familiar with fugitive dust rules.
Will discuss dust control with Capitol Center RP as well.