Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC16-00699
StatusFinaled
Name COLBY CURTISS
Site Address 2700 N CLOVERDALE RD
Project NameDropzone Apartments
Customer Number 
ePlanReviewNo
Description
BLDG 3: 32 unit apartment project, (4) 2 story, 8 unit apartment buildings
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/18/20177/18/20177/18/2017APASS
DetailsJim Sly
DOC - Permit Finaled7/18/20177/18/20177/18/2017PPASS
DetailsJim Sly
General Inspection6/16/20176/16/20176/16/2017 PASS
DetailsAndy J. Long
General Inspection5/1/20175/1/20175/1/2017 PASS
DetailsMelissa Jannusch
WIP on interior and exterior. Trash containment good. Correction: sweep trackout.
General Inspection3/14/20173/14/20173/14/2017 PASS
DetailsMelissa Jannusch
DI protection OK. Trash containment good. No trackout onto road. No corrections requested.
General Inspection1/25/20171/25/20171/30/2017 CANC
DetailsAndy J. Long
General Inspection12/8/201612/8/201612/8/2016 PASS
DetailsAndy J. Long
Permit sign and SWPPP information posted for Dropzone Apartments. No significant trackout and winter safety sand is now on the road. No discharges or spills on or around site. Framing is now in progress and parking lot paved and onsite stormwater inlet installed, No corrections at this time
Site Preparation10/20/201610/20/201610/20/2016PPASS
DetailsAndy J. Long
Colby Phone #: ###-####


Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696

Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.

Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH

Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM