Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberESC16-00865
StatusFinaled
Name JEFFREY A HANNES
Site Address 440 N CLOVERDALE RD
Project NameCloverdale Yard and Site Impro
Customer Number 
ePlanReviewNo
Description
Parking lot and new fencing with gates around ACHD maintenance yard.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/31/20181/31/20181/31/2018PPASS
DetailsMichael Zawacki
General Inspection12/29/201712/29/201712/29/2017 CANC
DetailsAndy J. Long
General Inspection11/13/201711/13/201711/13/2017 PASS
DetailsAndy J. Long
No issues. Not ready for final
General Inspection9/26/20179/26/20179/26/2017 CANC
DetailsAndy J. Long
General Inspection8/11/20178/11/20178/14/2017 CANC
DetailsAndy J. Long
General Inspection6/26/20176/26/20176/27/2017 PASS
DetailsAndy J. Long
Site parking area and curbing are now installed with connections to the unfinished storm water swales. Landscaping in progress. No trackout, fugitive dust or other issues. No corrections requested.
General Inspection5/10/20175/10/20175/10/2017 PASS
DetailsMelissa Jannusch
WIP. No sediment leaving site. Perimeter controls are intact. No corrections requested.
General Inspection3/24/20173/24/20173/24/2017PPASS
DetailsAndy J. Long
Parking lot now paved. WIP on apron entrances and perimeter landscaping. No violations observed..
General Inspection3/14/20173/14/20173/14/2017PPASS
DetailsMelissa Jannusch
Grading appears to be complete and ready for roads. No trackout. No ESC corrections.
General Inspection2/24/20172/24/20172/24/2017APASS
DetailsAndy J. Long
No trackout or discharges from site entrances. DI protection installed. Will need to repair some damaged perimeter wattles in areas where the sidewalk edge is below grade of the project. No fugitve dust. Minimal activity at time of inspection. No corretions requested.
General Inspection2/2/20172/2/20172/6/2017 CANC
DetailsAndy J. Long
General Inspection11/9/201611/29/201611/29/2016APASS
DetailsAndy J. Long
WIP. Perimeter watttles installed around site properly. No trackout to Cloverdale or Executive. MS4 inlets protected. No corrections needed.
General Inspection11/3/201611/9/201611/9/2016PPASS
DetailsAndy J. Long
Perimter wattles properly installed around active construction site. Onsite storm water drainage has sediment protecton BMPs installed. Stabilized entrances to area have been preserved. No significant trackout to Executive. No fugitive dust at time of inspection.

Approved. No corrections requested.
Site Preparation10/31/201611/2/201611/3/2016PCANC
DetailsAndy J. Long
rescheduled
Site Preparation10/31/201610/31/201610/31/2016PCANC
DetailsAndy J. Long
Jeff Phone #: ###-####

phone conference conductted. Site prep scheduled for Wed 11/2 PM
Conference10/31/201610/31/201610/31/2016APASS
DetailsAndy J. Long
phone conference with RP Jeff. ###-#### ACHD staging yard work approved to begin removing stock piles tomorrow AM. Site preparation walk through to be conducted on Wednesday.

RP familiar with ESC conditions. Permit sign to be posted with SWPPP info.