Site Final | 7/3/2017 | 7/3/2017 | 7/3/2017 | A | PASS |
Andy J. Long
|
|
|
Maverik store complete, landscaped and stabilized. Staging lot to the east of site has had an application of mulch. Stormwater swale installed, DI sediment bag installed on Ustick has been removed. ESC permit conditions satisfied.
|
General Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Andy J. Long
|
|
|
Employees now parking in staging lane to stay off mud/dirt, new rock installed at entrance. No new trackout. Silt fence perimeter installed. MS4 on Ustick has filter bag protection. Apprroved.
|
General Inspection | 3/24/2017 | 3/28/2017 | 3/30/2017 | A | PART |
Andy J. Long
|
|
|
No significant trackout but still no improved construction entrance provided since first notice 3/9.
RP to install new drain rock and prohibit all non-essential traffic into site until new approach and asphalt to be installed mid April.
Re-inspection schedule, if Fail, will assess inspection fee.
|
Tracking Control | 3/23/2017 | 3/23/2017 | 3/24/2017 | P | PEND |
Andy J. Long
|
|
|
Track out from yesterday has been cleaned.
Corrections remaining: - install new construction entrance or alternative BMP (rumble bars) - check inlet bag for maintenance
|
General Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | A | FAIL |
Andy J. Long
|
|
|
No improved construction entrance provided. Accumulated dirt and trackout in bike lane on south side of Ustick east of project entrace.
Request for sweeping and re-inspect construction entrance.
|
General Inspection | 3/9/2017 | 3/16/2017 | 3/23/2017 | P | CANC |
Andy J. Long
|
|
|
|
Tracking Control | 3/8/2017 | 3/8/2017 | 3/9/2017 | P | PART |
Andy J. Long
|
|
|
Trackout reported from yesterday was swept. Inlet down gradient from entrance area has sediment filter bag properly installed.
Verbal correction request to RP: - repost new ESC permit sign on SWPPP board - improve construction entrance trackout controls: i.e. lengthen entrance distance, turn over existing rock, add angular rock chunks, wheel brooming and regular cleaning of sidewalk apron
Will check on entrance improvements next week.
|
Site Preparation | 3/3/2017 | 3/3/2017 | 3/6/2017 | P | CANC |
Andy J. Long
|
|
|
|