Permit Information
Permit NumberESC16-01612
StatusFinaled
Name JIM WILLIAMS
Site Address 1000 E PARK BLVD
Project NamePark Boulevard MOB
Customer Number 
ePlanReviewNo
Description
Construction and site improvements for new medical office building. Existing asphalt to be preserved as stabilized construciton on Park Blvd. Inlet protection required on all existing MS4 strom drains receiving stormwater around site. Silt and construction fence to be installed on west LOD. ESC site preparation inspection required, call 608-7070 to schedule. No eNOI tracking # provided at time of plan review.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/15/20186/15/20186/15/2018 CANC
DetailsMichael Zawacki
DOC - Permit Finaled6/15/20186/15/20186/15/2018PPASS
DetailsMichael Zawacki
General Inspection4/30/20184/30/20184/30/2018 PASS
DetailsMichael Zawacki
Exterior work and landscaping complete. Site is clean. Section of parking lot still fenced off for storage, trash, and restrooms.
Site Final3/9/20183/14/20183/14/2018ANR
DetailsMichael Zawacki
Job trailer and fenced off storage still on site, dumpster in storage area. Blocksome still on DIs in parking lot.
General Inspection3/9/20183/9/20183/9/2018 CANC
DetailsAndy J. Long
General Inspection1/22/20181/22/20181/22/2018 PASS
DetailsMichael Zawacki
Work on exterior completed. All landscaping in place and site is stable. Inlet protection still installed in DI on traffic island at Park & Park Center. Job trailer and fenced staging area still on site.
Site Final11/21/201712/6/201712/6/2017ANR
DetailsMichael Zawacki
Job trailer and dumpster still on site. Blocksome installed in parking lot. Pallet of rebar still in parking lot. Landscaping is complete.
Site Final11/21/201711/21/201711/21/2017ANR
DetailsAndy J. Long
Not ready for final. Some onsite landscaping work still in progress. Dumpster, concrete washout, job trailer still onsite.

MS4 DI bags have been removed due to onsite stormwater retention and parking lot stabilization. Will check back for Site Final in December.
Random Inspection10/30/201710/30/201710/30/2017PPASS
DetailsMichael Zawacki
In process of installing sod and bark. Site contained.
General Inspection10/11/201710/11/201710/12/2017 PASS
DetailsMichael Zawacki
Site clean. Disturbed area is contained. Some discoloration on road but no loose trackout. Curb and gutters clean, DIs clean. Dumpster in use, site free of loose trash. Plastic sheeting being used to keep dust inside building. Very little dirt on side entrance but visible broom marks.
General Inspection8/23/20178/25/20178/25/2017APART
DetailsAndy J. Long
Sweep up Walnut sidewalk and gutter...
Complaint Inspection8/23/20178/23/20178/23/2017PPEND
DetailsAndy J. Long
dust

No fugitive dust plumes leaving site at time of inspection. Water truck onsite. Park Blvd currently being resurfaced, so lots of disturbed area around site. No discharges or spills observed. Will continue to monitor this week.
General Inspection7/25/20177/25/20177/25/2017APASS
DetailsAndy J. Long
General Inspection5/26/20175/26/20175/26/2017APASS
DetailsAndy J. Long
Foundation and initial frame work occuring. Site perimeter existing sidewalk and curbing has contained sediment. Solid construction entrance installed, no trackout. Permit sign posted by job trailer.
Random Inspection4/21/20174/21/20174/21/2017APASS
DetailsAndy J. Long
WIP on foundations. Exisitng hardscape and vegetation at perimeter has been installed. MS4 inlets have sediment filter bags installed. No trackout, fugitive dust, or discharges observed.
General Inspection3/10/20173/15/20173/15/2017APASS
DetailsMelissa Jannusch
No ESC issues observed. No trackout.
Site Preparation3/2/20173/2/20173/2/2017PPASS
DetailsAndy J. Long
Call hour to meet // Jill Phone #: ###-####

Perimeter BMPs installed (inlet protection, wattles on west end of project. Plan is to preserve existing parking lot surface and curbing for stabilized construction access on south end of project. Permit sign and CGP NOI posted.

Notified project managers about trackout, dewatering, and fugitive dust regulations.

Approved to start.