Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberESC17-00100
StatusFinaled
Name GENE G HARDING
Site Address 2327 W BOISE AVE
Project Name2327 & 2345 W. Boise Ave
Customer Number 
ePlanReviewNo
Description
New Duplex. BMPs. Inlet protection, construction entrance (on Boise Ave), 2 sand filled drainage windows protected with wattles, silt fence along perimeter of site, concrete washout, sand/gravel burlap bar or fiber wattle placed in the gutter flow line. Swales are around the sides and back of the property, sand/ gravel bags or fiber wattles are to be placed in the swale flow line.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/23/201710/23/201710/24/2017 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/24/201710/24/201710/24/2017PPASS
DetailsMichael Zawacki
Complaint Inspection7/18/20177/18/20177/19/2017PPASS
DetailsMelissa Jannusch
Grading is contained to lot. Fence okay and soil is continaed on site. Ensure the area is fully landscaped before ESC site final.

DI bag okay. Trash contained.
Site Preparation3/15/20173/15/20173/15/2017PNR
DetailsMelissa Jannusch
Not ready to start. No BMPs installed. Needs inlet protection, perimeter controls, and entrance. Spoke with RP. Excavator will install controls before starting work. He will call once the controls are implemented. Sign is posted.