Site Final | 12/28/2017 | 1/22/2018 | 1/23/2018 | A | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/26/2017 | 12/26/2017 | 12/28/2017 | | PEND |
Andy J. Long
|
|
|
waiting for snow melt to check for site final
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Michael Zawacki
|
|
|
Entire area paved. Currently landscaping in progress.
|
General Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Michael Zawacki
|
|
|
Vertical construction only. No earth disturbing activities. Pads are poured, mixer has perimeter controls. No spilled concrete visible.
|