Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC17-00400
StatusFinaled
Name KEVIN ANTONUCCI
Site Address 701 E BOISE AVE
Project NameTimberline High Classroom Add
Customer Number 
ePlanReviewNo
Description
New classroom building within developed campus area. Staging area will be in existing parking lot. Will provide construction entrance into disturbed area, concrete washout facility required, fiber wattle perimeter controls on north and south end of project area. MS4 inlet protection required on southwest corner of Boise Ave @ Apple. ESC plan and site map must be on site. Site preparation inspection required, call 608-7070.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/7/20188/7/20188/7/2018APASS
DetailsAndy J. Long
Kevin w/ ESI

Building complete. Surrounding landscaping and pathways are installed. Grass is growing well. No temporary BMPs left onsite. Some minor work conducted by Timberline facility staff next to the trailor.

ESC permit conditions satisfied.
General Inspection8/6/20188/6/20188/7/2018 CANC
DetailsAndy J. Long
General Inspection6/19/20186/19/20186/20/2018 PASS
DetailsMichael Zawacki
Addition construction looks complete. Landscapers are working on exterior west side of building. Dumpster still on site. No trackout or dust issues. No ESC issues.
General Inspection5/4/20185/4/20185/7/2018 CANC
DetailsAndy J. Long
General Inspection3/19/20183/19/20183/20/2018 CANC
DetailsAndy J. Long
General Inspection1/29/20181/30/20181/30/2018PPASS
DetailsAndy J. Long
WIP on school addition, footprint constructed, vertical and interior work in progress. No trackout or loose debris in Timberline parking lot. Site perimeter is clean. No ESC corrections requested.
General Inspection1/25/20181/25/20181/29/2018 CANC
DetailsAndy J. Long