Permit Information
Permit NumberESC17-00572
StatusFinaled
Name JACOB B MILLER
Site Address 12248 W EXECUTIVE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
New site development and warehouse project on NW corner of Executive @ Cloverdale. BMPs inlcude construction entrance to Exectutive and inlet protection for the MS4. Staging area shall include concrete washout facility. ESC plan has been prepared for project, no copy of NOI provided at time of review. Meets City of Boise ESCP requirements. Site preparation inspection is required
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/28/20182/28/20182/28/2018 CANC
DetailsMichael Zawacki
DOC - Permit Finaled2/28/20182/28/20182/28/2018PPASS
DetailsMichael Zawacki
General Inspection10/27/201710/27/201710/27/2017PPASS
DetailsMichael Zawacki
Site below grade, no material can get off. DIs clean. No washout on site, says they have drivers bring it back with them.
General Inspection7/24/20177/24/20177/24/2017PPASS
DetailsAndy J. Long
Very clean site. BMPs installed and maintained. No corrections needed.
General Inspection6/27/20176/27/20176/27/2017APASS
DetailsAndy J. Long
WIP o excavation of foundation. BMPs installed:

-ESC permit sign posted with SWPPP info
-rock construction entrance
- DI sediment protection
- water truck on site for dust supression

No violations observed. Approved.
Site Preparation6/7/20176/12/20176/12/2017APASS
DetailsAndy J. Long
9:00 AM Jake Miller ###-####

ESC plan and SWPPP onsite. RP and excavation crew attended pre-construction site meeting. Permit sign posted. Silt fence properly installed along the downslope north construction limit. Will be hauling off dirt, will install angular rock construction entrance to replace existing small rock tracking pad. MS4 sediment protection installed on Executive. Notified crew of concrete washout, fugitive dust, and trash containment requirements.