Site Final | 11/1/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Talked with Bryan getting last few punch list items done.
|
Site Final | 10/29/2019 | 11/1/2019 | 11/1/2019 | P | CANC |
Andy J. Long
|
|
|
to be rescheduled
|
General Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 10/14/2019 | 10/14/2019 | 10/16/2019 | P | PASS |
Andy J. Long
|
|
|
trash
Trash bin emptied. Trash across street picked up. RP is onsite supervising finishing touches. Slope behind home is to hydroseeded/taciifed tomorrow morning.
|
General Inspection | 9/26/2019 | 9/26/2019 | 9/26/2019 | | PASS |
Andy J. Long
|
|
|
WIP on final exterior work and need to landscape. No trackout, spills, or discharges observed
|
BMP Violation | 9/6/2019 | 9/10/2019 | 9/10/2019 | A | PASS |
Michael Zawacki
|
|
|
Dumped washout has been cleaned
|
General Inspection | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout for wall dumped. Message sent to RP. Follow up scheduled.
|
General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Andy J. Long
|
|
|
follow up inspection for trash pick up
Trash across the street picked up as requested. Sidewalk has been swept and dumped material scooped up. Roofing in progress, crew will need to pick up all waste packing materials in culdesac at end of the day.
|
Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | CANC |
Andy J. Long
|
|
|
|
Complaint Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | FAIL |
Andy J. Long
|
|
|
trash complaint
Loose trash is visible around site including water bottles, cans, styrofoam, construction material wrappings. Wind blown trash in grasses & weeds across the street and downhill from site.
Corrections needed:
- pick up all loose trash around site, on the adjacent lot downhill from site, in backyard, all around culdesac being used for staging. Pick up trash across the street along sidewalk from the fire hydrant up.
- scoop up piles of dumped washout and stucco, escially on lower adjacent lot. Sweep sidewalk and gutter where there is dirt/trackout visible.
Follow up inspection Tuesday PM. Notified RP, he stated trash will be picked up tomorrow. Follow up inspection scheduled.
|
BMP Violation | 7/2/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Andy J. Long
|
|
|
If any washout dumped or not cleaned around site, issue fine and pacel hold
Washout container placed on site on top of dumped washout. Washout was utiliized. Approved.
Will still expect that the dumped material is scraped off of ground and hauled to landfill.
No discharges, trackout, or windblown trash. Minimal activity at site.
|
BMP Violation | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | FAIL |
Andy J. Long
|
|
|
Concrete washout from retaining wall/driveway work dumped on ground . No concrete washout pit or container provided. Located next to culdesac sidewalk above site.
Clean up before Tuesday July 9 AM and provide washout container for remaining remain rinsing/washing needs.
Failure to comply will result in investigation fee and trade inspection parcel hold. Follow up scheudled.
No loose trash, trackout, or discharges. Silt fence frontage has been trampled.
|
General Inspection | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Michael Zawacki
|
|
|
Met with builder on site. They did trash walk and pick up on hillside behind home. Some dirt on sidewalk that they will sweep up. No trash issues or major ESC issues.
|
General Inspection | 6/10/2019 | 6/11/2019 | 6/18/2019 | A | PEND |
Andy J. Long
|
|
|
trash follow up
|
Complaint Inspection | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | FAIL |
Andy J. Long
|
|
|
Unserviced and overflowing trash bin caused windblown trash to be blown around culdesac and surrounding slopes during wind storm.
Correction: - all construction trash around Win Hollow needs to be picked up. This is the only active site with a trash structure, so all trash must be assumed to be from the site - get trash box serviced, relocate inside garage or increase frequency of service, provide a tarp or board to cover during periods of inactivity.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
post rain inspection Syman crew on site replacing inlet protection. Poly installed to catch water from roof and direct below home, silt fence catching flow. Silt fence with J-hook along front. Side lot is vacant and has some vegetation.
|
General Inspection | 5/28/2019 | 5/28/2019 | 5/28/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
- install perimeter sediment controls down slope from project along sidewalk and lot line to prevent muddy runoff onto sidewalks - have trash emptied - address significant erosion and slope damage behind home and below deck footings. Steep slopes should be protected with erosion control blankets after repair. RP stated they are going to install temporary gutters
|
Complaint Inspection | 3/22/2019 | 3/22/2019 | 3/27/2019 | P | PASS |
Michael Zawacki
|
|
|
Sidewalk has been removed at two locations. Concrete washout on site, extra mud was dumped on lot. Some mud on sidewalk but not bad. Street looks like it has been swept.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PEND |
Michael Zawacki
|
|
|
Crews on site doing foundation work. Pump truck and multiple sunroc trucks on site. Did not see any dumped washout or washout container. A-core on site cutting curb. Area will need to be cleaned at end of day, told workers on site.
|
Site Preparation | 3/5/2019 | 3/5/2019 | 3/7/2019 | P | PART |
Michael Zawacki
|
|
|
Called builder never called back. Excavation has begun. Will need to watch for runoff down hill and maintain silt fence. Wattle along front of perimeter is old and will need to be monitored. No BMPs on downhill side of lot, no permit dislayed.
|