Aging Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | NR |
Andy J. Long
|
|
|
Correction request:
- change out DI bag on Woodcreek; empty and re-install
Verbal correction to Willie.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Michael Zawacki
|
|
|
Home is framed, electricians on site. Sidewalk has been swept, no trash.
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | FAIL |
Michael Zawacki
|
|
|
Trackout onto road and sidewalk. Talked to RP of homes under construction and asked for cleanup.
|
General Inspection | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PASS |
Michael Zawacki
|
|
|
No work has begun.
|
Site Preparation | 11/15/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Andy J. Long
|
|
|
willie
Site meeting with RP for Red Oak. They will be building all lots in The Avenues sub. Subdivsion infrastructure is complete, storm drains have sediment bags installed.
Reviewed ESC rules regarding: -post permit sign - contain construction and employee trash - provide lined concrete washout above ground or below grade - sweep up track out, restrict parking to street only and construction traffic should use Woodcreek to exit site.
Approved for construction.
|