Site Final | 5/22/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Andy J. Long
|
|
|
WIP. GC-RP paid to have pump truck washout offisite. Sidewak swept, backfill not placed yet
|
General Inspection | 8/2/2019 | 8/6/2019 | 8/5/2019 | P | PASS |
Michael Zawacki
|
|
|
Lot excavated for basemnt. All fill is stored on lot, water is available. No issues at time of inspection.
|