Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC19-00608
StatusIssued
Name CASEY UNRUH
Site Address 1600 W GOWEN RD
Project NameITD Aeronautics Office/Hangar
Customer Number 
ePlanReviewNo
Description
Construction of a new aircraft hangar and office/support space for the Idaho Transportation Department Aeronautics division, including a new parking lot and entrance roadway. Perimeter silt fence for areas down gradient of disturbed area, preserve vegetation outside of clearing limits, protect existing drainage facilities, prevent trackout and fugitive dust. Site preparation inspection is REQUIRED. Site has a waste management plan to comply with the Green Construction Code,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/30/20206/30/20206/30/2020 PASS
DetailsMichael Zawacki
Outside hangar work looks completed. Still materials and backfill laying around, no parking lot or landscaping. Area is fenced, has entrance before exiting fence and before Gowen.
No issues at site.
General Inspection5/12/20205/12/20205/12/2020 PASS
DetailsMichael Zawacki
WIP on hangar. Site has gravel acces, also has construction entrance into fenced are. All materials stored on site. Buffer out to Gowen, construction on airport outside rear perimeter fence.
NBo issues at site.
General Inspection3/24/20203/24/20203/24/2020 PASS
DetailsMichael Zawacki
Site contained. Located on airport/hanger.
General Inspection2/5/20202/5/20202/6/2020 CANC
DetailsAndy J. Long
Site Preparation10/15/201910/15/201910/16/2019PDONE
DetailsMichael Zawacki
Grading has begun, work on airport grounds behind gate and fence.