Information based on query as of Tuesday, April 30, 2024.
Permit Information
Permit NumberESC19-00756
StatusFinaled
Name BRYAN MURDOCH
Site Address 3492 E HEARTLEAF DR
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions. Maintain sediment protection on receiving storm drain, prevent track out. Install sediment control wattle on back side of parcel. Contain concrete washout. Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/22/20205/22/20205/22/2020PPASS
DetailsAndy J. Long
Homeowner has revegetated with weeds and debris. No material leaving site. No ESC requests for permitee, no further ESC inspections

Bond issued by Public Works for reveg/site stablization in February 2020
Site Final5/14/20205/15/20205/15/2020PNR
DetailsMichael Zawacki
Not landscaped, has revegetation bond. Home is completed and occupied.
General Inspection5/14/20205/14/20205/14/2020 CANC
DetailsAndy J. Long
rescheduled for site final
General Inspection4/28/20204/28/20204/28/2020 DEFR
DetailsMichael Zawacki
Talked to RP. Will schedule final when homes on Heartleaf have been landscaped.
Site Final4/9/20204/10/20204/10/2020PNR
DetailsMichael Zawacki
Still needs to be landscaped.
General Inspection4/9/20204/9/20204/9/2020 CANC
DetailsAndy J. Long
General Inspection3/25/20203/25/20203/25/2020 PASS
DetailsMichael Zawacki
Exterior work completed, still needs to be landscaped.
General Inspection3/10/20203/10/20203/10/2020 PASS
DetailsMichael Zawacki
Exterior completed, not landscaped.
General Inspection8/6/20198/6/20198/6/2019PPASS
DetailsMichael Zawacki
Foundation poured, washout on site and used, is about full. Pool guys on site, home will have an attached indoor pool.
Sidewalk needs to swept at end of day.
Site Preparation7/2/20197/3/20197/3/2019APASS
DetailsMichael Zawacki
Met with RP.
Dirt at site is old fill from road construction, lots of ash. Blows away easily, will be removed from site. Crew will get water line hooked up first for dust control.