Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC19-01457
StatusIssued
Name DARREN SPIERS
Site Address 1872 W SILVER CREST DR
Project NameWardhaugh Residence
Customer Number 
ePlanReviewNo
Description
per ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/11/20208/11/20208/12/2020 PASS
DetailsMichael Zawacki
Work on concrete sidewalk and driveway, using washout down on eyrie phase. No issues.
General Inspection7/21/20207/21/20207/21/2020PPASS
DetailsMichael Zawacki
Met with RP Greg while at site. Had worker clean garbage off hillside. Everything in good shape.
General Inspection5/21/20205/21/20205/28/2020PPASS
DetailsAndy J. Long
General Inspection5/14/20205/14/20205/14/2020PPASS
DetailsMichael Zawacki
Site is clean. Perimeter controls all the way around. All workers parked on street.
General Inspection4/15/20204/15/20204/15/2020PPASS
DetailsMichael Zawacki
Home is framed. No loose trasj at site. Driveway is clean pit run, perimeter controls installed.
Tracking Control3/31/20203/31/20203/31/2020PPEND
DetailsAndy J. Long
Framing crane caused some trackout. Onsite crew member cleaning it up - stated that builder is ordering more gravel/rock for construction entrance & trackout prevention.
General Inspection3/4/20203/4/20203/4/2020PPASS
DetailsMichael Zawacki
WIP on forms and foundation, large washout on site. Large pile of backfill, will need to watch for runoff or seeing if it needs to be stabalized. Trailers in dirt, is currently dry.
Site Preparation2/20/20202/21/20202/21/2020APASS
DetailsMichael Zawacki
Plan to start Monday, Spiers is excavator.
Wattle on back and downhill sides. Will install snake bags below limits of disturbance. Washout will be dug and placed where it won't receive water. Has met Colin, knows to keep clean.
General Inspection2/13/20202/13/20202/13/2020PPASS
DetailsMichael Zawacki
No issues on hillside. All materials on site, no tracking. No loose or blowing garbage.
Site Preparation1/29/20201/30/20201/30/2020APASS
DetailsMichael Zawacki
Met foreman at site. Will install wattle along back and side perimeter. Will put snake bags in gutter, DIs are down hill and already protected. Will not start for a few weeks. The concrete is scheduled out and they don't want to leave a hole exposed while waiting.
Site Preparation1/27/20201/27/20201/27/2020PDONE
DetailsMichael Zawacki
Email sent to RP and GC