General Inspection | 5/22/2020 | 5/27/2020 | 5/28/2020 | A | FAIL |
Michael Zawacki
|
|
|
follow up on concrete washout stabilized entrance and trackout sweep up Nothing has been done.
|
BMP Violation | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | FAIL |
Andy J. Long
|
|
|
No stabilized entrance to concrete washout facility. Trackout on Tornak and Tiger Lily,
Notified Blackrock RP to fix early next week. Follow up scheduled
|